Risks Related to Renergen

Unless the context otherwise requires, references in this section under the heading “Risks Related to Renergen” to “Renergen” refer to Renergen Limited and its subsidiaries. The following risk factors relating to Renergen are organized under the sub-headings below.

Risks Related to Renergen’s Limited Operating History, Financial Position and Need for Additional Capital

Renergen has a limited operating history, which makes it difficult to evaluate its business and prospects, and Renergen is susceptible to the difficulties associated with rapid growth and expansion.

Renergen’s LNG and helium extraction business has a limited operating history. Renergen has produced LNG since September 2022, although production remains below nameplate capacity. Its helium liquefaction system, first commissioned in January 2023, has not yet achieved sustained production. Operational challenges, including a leak in the helium cold box, required the system to be taken offline for repair. Subsequent to repair an initial test batch confirmed product quality in February 2025, the system was shut down while Renergen focused on drilling to increase gas supply to the facility. LNG production was also adversely affected during fiscal year 2026 by vertical seismic profile activities conducted on high-flow wells, a three-month plant outage resulting from compressor failures, and carbon dioxide spikes that required gas venting, which collectively contributed to a decline in average daily LNG production to approximately 10.65 tons per day in fiscal year 2026 from 13.38 tons per day in the prior year, well below the facility’s nameplate capacity. The helium system’s efficiency depends on feed gas volumes and is expected to improve progressively as additional feedstock is introduced, until the facility reaches nameplate capacity. While, in August 2026, Renergen recommenced commissioning of the helium system in anticipation of reaching nameplate production in the fourth quarter of calendar year 2026, there is no guarantee that such operational challenges will not occur in the future. As a result, there is only limited historical financial and operating information upon which to evaluate Renergen’s performance, and the results from its current producing wells are not necessarily indicative of the results of future drilling. In addition, Renergen expects to grow rapidly over the next several years, and its success will depend on its ability to manage that growth and the increased demands on management, including increased administrative burden, capital requirements and organizational challenges common to large, capital-intensive operations. Renergen’s operating results could be adversely affected if it does not successfully manage these difficulties.

Renergen will require substantial additional capital to fund its operations and the development of Phase 2 of the Virginia Gas Project, which may not be available on acceptable terms, or at all.

Renergen will require substantial additional capital over a prolonged period to fund its operations, its multi-year drilling program and the development of Phase 2 of the Virginia Gas Project, the build cost of which is expected to be funded in significant part with senior secured debt. Renergen may not be able to raise or generate the capital required to do so on acceptable terms, or at all, and any inability to obtain needed financing could require Renergen to delay, curtail or abandon development activities. Any of the foregoing could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Risks Related to the Expansion of the Virginia Gas Project

As Renergen further expands its current operations into Phase 2, Renergen may face additional problems associated with natural gas exploration and development projects.

Renergen’s ability to sustain or increase levels of helium and LNG production is dependent in part on the successful expansion of Renergen’s operations, including the development of the Virginia Gas Project. The development of a natural gas facility takes a number of years to complete and requires substantial capital

1

 


investment. The economic feasibility of such projects is based upon many factors, including, among others: the accuracy of reserve estimates; helium and LNG recoveries; sufficient quality and/or quantity of feed gas; capital and operating costs; government regulations relating to prices, taxes, royalties, land tenure, land use, importing, exporting and environmental protection; and helium and LNG commodity prices. Projects to replace existing capacity or expansions are also subject to the successful completion of feasibility studies, the issuance of necessary governmental permits and the availability of adequate financing. If Renergen is unable to execute such projects successfully, Renergen could face problems such as delays, cost overruns and lower than predicted revenues, which could have an adverse effect on Renergen’s business, financial condition and results of operations.

In addition, Renergen’s management is conducting an ongoing plant design optimization review for Phase 2, and the overall project scope, size, design, sequencing, production capacity, product mix and timeline may differ materially from the original design parameters. As part of that review, Phase 2 may be constructed in a phased expansion rather than as a single unit, which could extend the development timeline. The optimization review is being informed by, among other things, current global helium market conditions and supply disruptions, evolving local energy demand, and the expected availability of equity and debt financing. As a result, the actual Phase 2 development plan, once finalized, may differ significantly from prior estimates and investor expectations regarding the project’s scale, cost and timeline.

Renergen has several additional supporting authorizations, licenses and permits to obtain before Phase 2 of the Virginia Gas Project is considered fully permitted, which Renergen may not timely obtain or obtain at all.

Renergen has several additional supporting authorizations to obtain before Phase 2 of the Virginia Gas Project is considered fully permitted. Renergen may have difficulty obtaining these required authorizations, permits and licenses for the operation of Phase 2. These permits, licenses and approvals are issued by ministries and/or agencies of the South African government and are crucial to the success of Phase 2. Although Renergen has applied for all consents necessary to conduct Renergen’s business to date, there can be no assurance that Renergen will obtain, retain, timely renew or comply with all of the terms and conditions attaching to such consents, which could delay Renergen’s progress or curtail some of Renergen’s plans entirely.

Renergen’s overall cost to complete construction of Phase 2 is an estimate based on assumptions that may be inaccurate and are based on existing economic and operating conditions that may change in the future. If actual costs are materially greater than Renergen’s estimates, Renergen’s business, financial condition and results of operations may be negatively impacted.

The estimate of the overall build cost to complete development, permitting and financing of Phase 2 as currently designed is in excess of $1.0 billion (including borrowing costs and general corporate costs during construction). This estimate is based on assumptions that may be inaccurate and existing economic and operating conditions that may change in the future, which could materially and adversely affect the cost of construction beyond Renergen’s estimates. In addition, Renergen’s management is conducting an ongoing plant design optimization review for Phase 2, and the overall project scope, size, design sequencing, production capacity, product mix and timeline may differ materially from the original design parameters. As part of that review, Phase 2 may be constructed in a phased expansion rather than as a single unit, which could extend the development timeline. The cost of construction could change for a variety of reasons including, but not limited to, increased labor costs, increased energy costs and cost overruns. Furthermore, the world economy is facing the risk of increasingly high inflation as a result of, among other things, continued supply constraints with rising demand and increased energy prices. This sharp rise in inflation has created pressure on economies and their central banks to reconsider accommodative and expansionary monetary policies, resulting in higher interest rates and associated monetary policy aimed at reducing excess liquidity in the market. The current levels of inflation in South Africa, and globally, may prevent comparison between the development of Phase 1 and the development of Phase 2, as the costs of goods and services used in the development of Phase 1 may not correlate with the costs of goods and services used for the development of Phase 2, making it difficult to predict the cost of materials and the price of labor needed to complete the construction of Phase 2. Additionally, high rates of inflation may curtail Renergen’s ability to access international financial markets and may lead to further government intervention in the economy, which may introduce government policies that may materially and adversely affect Renergen and constrain Renergen’s ability to purchase the materials or hire the labor required to complete the development of Phase 2. If the actual costs of

2

 


construction are materially greater than Renergen’s estimates, Renergen’s business, financial condition and results of operations will be negatively impacted.

There can be no assurance that Renergen will be able to obtain the necessary financing for Phase 2 in a timely manner and/or on acceptable terms, if at all.

Renergen has received conditional approval for senior secured debt funding from the DFC of up to $535 million. In addition, the Standard Bank of South Africa has previously indicated its willingness to consider supporting Phase 2 of the Virginia Gas Project with up to $250 million of senior secured debt funding. No binding definitive agreements have been executed with respect to either facility, and there can be no assurances that Renergen will be able to negotiate and enter into such agreements on terms that are favorable to Renergen, or at all. In addition, the Commitment Letter is non-binding and subject to a number of terms and conditions, contingencies and uncertainties, which we may not be able to satisfy, or may need to renegotiate, and there is no guarantee that the DFC would be willing to reach terms favorable to us, or at all. See “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Indebtedness-Conditional Indications of Support from the DFC and SBSA” for additional information regarding conditions precedent to funding by the DFC. The proposed facilities are expected to be interdependent, with the full funding package required to be in place through binding definitive agreements before any drawdown under either facility.

If Renergen is unable to fund Renergen’s planned capital expenditure for Renergen’s projects as a result of, among other factors, difficulties in raising funding to support future capital expenditures and investments, Renergen may no longer be able to complete capital projects. In addition, Renergen may be unable to develop new capital projects so as to continue production at cost-effective levels. Renergen’s capital expenditures financed by borrowing additional funds may increase Renergen’s leverage and make it more difficult for Renergen to satisfy Renergen’s obligations, limit Renergen’s ability to obtain additional financing to operate Renergen’s business, and require Renergen to dedicate a substantial portion of Renergen’s cash flow to payments on Renergen’s debt, which may reduce Renergen’s ability to use Renergen’s cash flow to fund working capital, capital expenditures and other general corporate requirements, and place Renergen at a competitive disadvantage relative to some of Renergen’s competitors that have less debt.

Managing a project as substantial in size as Phase 2 of the Virginia Gas Project requires sufficient technical, commercial and project management capacity and there can be no assurance that Renergen’s current management team has sufficient capacity.

Successful implementation of Phase 2 of the Virginia Gas Project requires sufficient technical, commercial and project management capacity. As part of the execution strategy for Phase 2, Renergen has retained Worley, a global engineering entity, WorleyParsons Limited, to act as engineer to ensure sufficient skill set, experience, management capability and resources are available to Renergen for the execution of Phase 2 of the Virginia Gas Project. The scope of the owners engineer’s work and its execution will be overseen by Renergen’s management team. However, there can be no assurance that Renergen’s current management team has sufficient capacity, or that it can acquire additional skills to supplement that capacity, to manage a project of this scale and to realize cost and operational efficiencies throughout Phase 2 or maintain those at the existing operations.

Even if Phase 2 is completed, the project may not operate as expected or may cost more to operate than expected.

Renergen categorizes Phase 2 as the expansion of its existing, authorized operations through the drilling of additional wells, the construction of additional natural gas gathering pipelines and the construction of a significantly larger (approximately 12x larger) processing and liquefaction facility, and the associated road tanker distribution facilities and downstream customer dispensing facilities. Phase 2 is a major undertaking and Renergen may encounter unexpected obstacles in the future, such as inflationary pressures, rising interest rates and associated monetary policy and increasing power shortages or blackouts, that were not present during the construction of Phase 1 and that Renergen cannot overcome within budget, within Renergen’s expected timeframe, or at all. In addition, as part of its ongoing plant design optimization review, Renergen may construct Phase 2 in a phased expansion rather than as a single unit, which Renergen’s management believes may allow for more flexible development and potentially accelerate early-stage cash flows, but which could also extend the overall development timeline and alter

3

 


project economics. Even if Phase 2 is completed, the project may not operate as expected or may cost more to operate than expected. Renergen’s results of operations and financial condition are, to a large extent, dependent upon the overall success of Phase 2. Accordingly, any changes in the expected operation or cost of operation of the projects in Phase 2 may adversely impact Renergen’s results of operations and financial condition.

The construction and operation of gas gathering pipelines may pose unforeseen difficulties, delays or costs, which could impact Renergen’s profitability and cause a delay in Renergen’s operations.

The development of the Virginia Gas Project includes construction, and ultimately operation, of low-pressure well-site gathering pipelines that deliver production to a liquefaction facility. The construction and operation of the gathering pipelines poses a number of risks, including risks related to:

•
design flaws in the pipeline infrastructure;
•
technical vulnerabilities in information systems that are used to manage and control the flow of gas;
•
delays in construction caused by third-party providers or contractors or delays in obtaining necessary permits, authorizations or licenses for construction or operation of the pipelines;
•
improper installation techniques, material defects, and/or environmental factors resulting in corrosion or material fatigue that could impact ongoing pipeline operations;
•
delays caused by Renergen’s lack of ownership of the land on which Renergen will own Renergen’s pipelines;
•
inadequate maintenance and quality management, which may affect overall performance, recoverability and efficiency;
•
costs and liabilities resulting from performance of pipeline integrity testing programs and related repairs;
•
construction and operating cost overruns that cannot be passed on to the customer;
•
unforeseen plant outages;
•
inability to access gas gathering infrastructure due to abnormally inclement weather or other unforeseen circumstances;
•
damage to Renergen’s pipelines and other facilities due to climatic events and severe weather;
•
production variability or system disruptions;
•
theft or vandalism of wellhead and/or pipeline infrastructure;
•
community protest, including protest caused by a perceived lack of local community participation in the project and permanent job opportunities for local residents; and
•
inability to deliver production due to a force majeure event or other unforeseen circumstances.

There is no assurance that Renergen will be able to execute future take-or-pay agreements with customers on favorable pricing terms, if at all.

Renergen’s results of operations depend on its ability to strategically execute offtake agreements with customers. Renergen expects to contract the majority of the LNG it produces on five- to eight-year take-or-pay agreements, servicing the industrial, logistics and potentially gas-to-power industries. There is no assurance that Renergen will be able to execute these agreements on favorable pricing terms, if at all. If Renergen is unable to negotiate these contracts, or is unable to secure favorable prices and terms, Renergen’s business, financial condition, results of operation and prospects could be adversely affected.

Renergen has been unable in the past, and may be unable to meet in the future, its delivery obligations under Renergen’s existing take-or-pay offtake agreements, which contain minimum volume commitments. Any failure by Renergen to satisfy the minimum volume commitments could lead to contractual penalties that could adversely affect Renergen’s results of operations and financial position.

Renergen has entered into multi-year take-or-pay offtake agreements for the sale of LNG and liquid helium produced at the Virginia Gas Project. Under these agreements, Renergen is obligated to make contracted volumes available for delivery to Renergen’s customers on a periodic basis, and Renergen’s customers are correspondingly obligated to purchase minimum volumes or pay for volumes not taken. If Renergen fails to make the contracted volumes available, Renergen’s customers may have the right to source alternative supply at Renergen’s expense,

4

 


reduce or suspend their payment obligations, seek contractual damages, or terminate their agreements with Renergen. Renergen’s ability to fulfill its delivery obligations depends on a number of factors, many of which are partially or entirely beyond its control, including, the successful completion and tie-in of additional production wells, reliable operation of the processing plant, and adequate gas gathering infrastructure, flow rates, reservoir conditions, Renergen’s ability to expand production capacity and drill additional wells. Furthermore, delays in the procurement, delivery, or commissioning of such equipment, whether due to supply chain disruptions, manufacturing delays, or logistical constraints, could impair Renergen’s ability to achieve or maintain production levels sufficient to satisfy Renergen’s delivery commitments.

If Renergen fails to meet Renergen’s delivery obligations, Renergen could experience a loss of revenue from contracted volumes, exposure to contractual damages or penalty provisions, an obligation to reimburse customers for the cost of procuring alternative supply, and the potential termination of one or more offtake agreements. The loss of key customers or a pattern of delivery shortfalls could also damage Renergen’s reputation and impair Renergen’s ability to negotiate favorable terms in future offtake agreements. A material failure to meet delivery commitments, or the termination of significant offtake agreements, could adversely affect Renergen’s ability to obtain or maintain project financing and could trigger defaults or covenant breaches under Renergen’s existing credit facilities, which could in turn result in acceleration of outstanding indebtedness. Furthermore, under the take-or-pay structure of Renergen’s agreements, Renergen’s customers' payment obligations are generally contingent upon Renergen’s making the contracted volumes available for delivery. If Renergen is unable to make volumes available due to production shortfalls or operational disruptions, Renergen’s customers' take-or-pay obligations may be reduced or suspended, resulting in lower-than-expected revenue even in periods when market demand for Renergen’s products remains strong. This asymmetry could materially and adversely affect Renergen’s results of operations, financial condition, cash flows, and ability to fund the continued development of the Virginia Gas Project. For information concerning our delivery commitments, see “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Components of Results of Operations.”

As Renergen’s customer contracts expire, Renergen may not be able to replace them with agreements on similar terms, or at all.

Certain helium and LNG contracts in Renergen’s portfolio will be subject to expiration. If the price of helium or LNG is declining at the time of negotiating a replacement contract, Renergen’s ability to negotiate or replace these contracts on terms that are acceptable to Renergen, or at all, may be adversely impacted. Renergen has a limited customer base and expects that a significant portion of Renergen’s future revenues will be from a limited number of customers, which could result in Renergen having less leverage in contract negotiations. Further, because of Renergen’s limited customer base, the loss of any significant customer could adversely affect Renergen’s operating results. Renergen cannot provide any assurance that Renergen will be able to negotiate or replace these contracts once they expire, and, even if Renergen is able to do so, Renergen cannot provide any assurance that Renergen will be able to obtain the same prices or terms it currently receives. If Renergen is unable to negotiate or replace these contracts, or is unable to secure prices and terms at least equal to the current prices and terms Renergen receives, Renergen’s business, financial condition, results of operation and prospects could be adversely affected.

Renergen may experience unforeseen difficulties, delays or costs in implementing Renergen’s business strategy and operational plan.

Renergen’s ability to grow Renergen’s business will depend on the successful implementation of Renergen’s existing and proposed strategic initiatives and current operational plans. The successful implementation of Renergen’s strategic initiatives and operational plans, including the realization of Renergen’s production growth, depends upon many factors, with some of such factors outside Renergen’s control. Renergen may prove unable to deliver on production targets. Unforeseen difficulties, delays or costs may adversely affect the successful implementation of Renergen’s business strategy and plans, and such strategy and plans may not result in the potential benefits. For example, a number of factors, including, but not limited to, operating costs, safety-related issues, organized labor action and technical issues may result in a failure to meet operations targets or strategic goals. Any such difficulties, delays or costs could prevent Renergen from fully implementing Renergen’s business strategy, which could have a material adverse effect on its business, operating results and financial condition.

5

 


Risks Related to Renergen’s Business

Because Renergen holds South Africa’s first and only onshore petroleum production right for the extraction and production of natural gas and helium and part of Renergen’s business strategy involves using some of the latest available slant well drilling and completion techniques, Renergen’s drilling results in South Africa may be more uncertain than drilling results in areas that are developed and have established production.

Renergen is a new producer of liquid helium and holds South Africa’s first and only onshore petroleum production right for the extraction and production of natural gas and helium. As a result, Renergen’s drilling results in South Africa may be more uncertain than drilling results in areas that are developed and have established production. Newer formations and areas have limited or no production history and, consequently, Renergen is more limited in assessing future drilling results in these areas. In addition, part of Renergen’s drilling strategy to maximize recoveries involves the drilling of slant wells, the locations of which are determined based on aeromagnetic and gravity surveys, re-processed seismics and data obtained from prior drilling campaigns. The difficulties Renergen faces drilling slant wells include: the fracturing of drill rods and rapid loss of inclination due to the intersection of softer rocks, which reduces the entry angle and decreases the probability of success. The difficulties Renergen faces while completing slant wells include: the loss of inclination that affects trajectory, the gravitational impact on centralization efforts, which can cause improper cement bonds and necessitate the insertion of additional migratory casings, and reductions in Renergen’s ability to log accurately, which reduces the quality of data received. Renergen’s experience with drilling slant wells in the area to date, as well as the industry’s drilling and production history in these formations, is limited. Since Renergen has limited drilling history, Renergen cannot assure you that all drilling prospects will be economically viable or that Renergen will not abandon its investments. Renergen cannot assure you that targeted well locations for prospects within Renergen’s area will be profitably developed, that wells drilled by Renergen in prospects that Renergen pursues will be productive or that Renergen will recover all or any portion of its investment in such unproved property or wells.

Renergen’s identified drilling locations are scheduled out over many years, making them susceptible to uncertainties that could materially alter the occurrence or timing of their drilling. In addition, Renergen may not be able to raise the substantial amount of capital that would be necessary to drill such locations.

Renergen’s management and technical teams have specifically identified and scheduled certain drilling locations as an estimation of Renergen’s future multi-year drilling activities. Renergen’s ability to drill and develop these locations depends on a number of uncertainties, including natural gas prices, the availability and cost of capital, drilling and production costs, availability of drilling services and equipment, drilling results, gathering system and pipeline transportation constraints, access to and availability of water sourcing and distribution systems, regulatory approvals and other factors. Because of these uncertain factors, Renergen does not know if the numerous drilling locations Renergen has identified will ever be drilled or if Renergen will be able to produce natural gas from these or any other drilling locations. As such, Renergen’s actual drilling activities may materially differ from those presently identified.

Renergen may be unable to drill many of Renergen’s identified locations. In addition, Renergen will require significant additional capital over a prolonged period in order to pursue the development of these locations, and Renergen may not be able to raise or generate the capital required to do so. Any drilling activities Renergen is able to conduct on these locations may not be successful, may not result in production or additions to Renergen’s estimated proved reserves and could result in a downward revision of Renergen’s estimated proved reserves, which could have a material adverse effect on Renergen’s future business and results of operations.

Renergen’s results of operations and financial condition are dependent upon the economic, environmental, social and political conditions in South Africa.

All of Renergen’s existing assets are in South Africa, and Renergen expects to complete construction projects and secure additional development projects in South Africa. As a result, the performance of Renergen’s operations is dependent upon the economic, environmental, social and political conditions in South Africa, and Renergen is exposed to a variety of risks, including risks related to:

•
heightened economic volatility;

6

 


•
difficulty in obtaining authorizations, permits and licenses required for the operation of Renergen’s projects and planned projects;
•
fluctuations in revenues, operating margins and/or other financial measures due to currency exchange rate fluctuations and restrictions on currency and earnings repatriation;
•
trade protection measures, import or export restrictions, licensing requirements and/or restrictive conditions, codes, norms and standards;
•
occupational safety, work hazards, and local labor laws and regulations;
•
potentially adverse tax developments or interpretations;
•
changes in political and/or social conditions;
•
fluctuations in the availability of funding;
•
changes in Renergen’s relationships with the different stakeholders in the communities surrounding Renergen’s facilities;
•
the proximity, cost, availability and capacity of natural gas and helium pipelines and other transportation facilities and equipment;
•
changes in the regulatory legal framework, including the costs of complying with environmental and energy regulations; and
•
consumer demand for lower-carbon forms of energy.

Renergen’s Virginia Gas Plant, located near Virginia in the Free State Province of South Africa, is subject to poor socio-economic conditions, which could hinder Renergen’s progress.

Renergen’s Virginia Gas Plant is located in the Free State Province of South Africa. South Africa’s unemployment rate was 33.6% in the second quarter of 2026. Poor socio-economic conditions in these communities increase expectations for employment from businesses operating in these communities and other socio-economic benefits. Historically, high unemployment rates contribute to social unrest. Furthermore, local governments and communities have demonstrated an increased reliance and growing expectations on energy companies to combat such unemployment, which may contribute to disruptions in operations due to community activism and lack of local delivery services. Renergen strives to employ from, and integrate, local communities where possible, and Renergen regularly engages and monitors Renergen’s interaction with local communities in which Renergen operates, including through community development programs with localized procurement opportunities; however, any such disruptions in Renergen’s operations due to community activism or social unrest may adversely affect Renergen.

Renergen uses third-party providers and contractors to conduct Renergen’s operations, and the lack of availability of, or failure to properly perform services by, one or more of these third-party providers or contractors may adversely affect Renergen.

The lack of availability of, or failure to properly perform services by, one or more of Renergen’s third-party providers or contractors could result in a decrease in Renergen’s production and/or delay the development of projects. A number of resources, such as compressors, liquefaction equipment, helium and cryogenic equipment and control systems, are only available through a limited number of third parties, and lead-times, work slowdowns, stoppages, or other labor- or services-related developments or disputes involving such third parties or contractors or their respective employees or services providers are out of Renergen’s control.

There can be no assurance that Renergen will be able to secure in a timely manner, or on commercially acceptable terms or at all the provision of all the services that Renergen will need to execute its business plans, or that such arrangements (both current and planned) will be sufficient for Renergen’s future needs and/or will not be interrupted. Renergen has previously entered into various Agreements of Mandatory, commonly known as Section 37(2) Agreements, which limit Renergen’s liability to third parties by placing the legal liability on the third-parties for acts or omissions undertaken by their employees. Renergen also requires all of its third-party service providers to be in good standing with a compensation fund in order to mitigate any potential liability Renergen may face in terms of the Compensation for Occupational Injuries and Diseases Act. However, Renergen cannot be certain that Renergen will not incur liability to third parties as a result of the actions of its contractors.

7

 


In addition, certain of the services Renergen requires are, or may in the future be, only available from a limited number of specialized providers, and Renergen may encounter difficulties in securing the services of specialized contractors due to high demand for those services. As a result, Renergen is dependent on external contractors performing and fulfilling their obligations satisfactorily. While Renergen is not aware of any specific failures or delays in providing such services, Renergen’s business and development plans may be adversely affected by any failure or delay by third parties in providing these services, by any change to the terms on which these services are made available, or by the failure of such third-party providers to provide services that meet Renergen’s quality or volume requirements. If Renergen determines it necessary to change a provider of such services, Renergen may experience additional costs, delays, interruptions to production, or other adverse effects on Renergen’s business, and Renergen may not be able to find adequate replacement services on commercially acceptable terms, on a timely basis, or at all. In addition, in connection with the proposed senior secured debt facilities that the DFC and the Standard Bank of South Africa have previously indicated their willingness to consider supporting for Phase 2, Renergen will be required to enter into business, construction and operational arrangements to deliver the Phase 2 facilities with suitably skilled contractor(s) to the satisfaction of the DFC and the Standard Bank of South Africa.

Renergen currently relies on outside contractors to perform key roles, such as drilling, downhole (wireline) logging and compositional sampling. Renergen will also rely on Worley to perform the owners engineer role on behalf of Renergen for Phase 2 of the Virginia Gas Project, and Renergen will rely on specialist Engineering, Procurement and Construction contractors for execution and construction of the Phase 2 plant. Renergen may also rely on specialized operating and maintenance contractors who are appointed for the short- to medium-term to assist with the operation of Renergen’s Phase 1 plant and the development of Renergen’s Phase 2 plant. These contractors will be selected based on international and, where possible, local experience. During the construction of Phase 2, Renergen also plans to appoint an independent consultant who must be registered with the South African Council for the Project and Construction Management Professions to oversee and audit Renergen’s OHSA implementation and Renergen’s third-party service providers. The success of Renergen’s operations and activities remains significantly dependent on the efforts, abilities and performance of outside contractors.

Should Renergen be unable to acquire or retain third-party providers or contractors of key services on favorable terms, or should there be interruptions to, or inadequacies with, any services provided, Renergen may need to incur additional capital and operating expenditures to perform or correct such services. The occurrence of one or more of these risks could have a material adverse effect on Renergen’s business, results of operations and financial condition.

All of Renergen’s operations are conducted in one geographic area. Any adverse developments at Renergen’s facility could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Because all of Renergen’s operations are conducted in one geographic area located in Virginia, Free State Province, South Africa, an event such as an explosion, substantial gas leak, fire, equipment malfunction or severe weather conditions, including water shortages or other drought-related conditions, that adversely affect Renergen’s facility could significantly disrupt Renergen’s natural gas or helium production operations and Renergen’s ability to supply LNG and helium to Renergen’s customers. Additionally, as a result of this concentration, Renergen may be disproportionately exposed to the impact of regional supply and demand factors, delays or interruptions of production from wells in these areas caused by governmental regulation, processing or transportation capacity constraints, market limitations, availability of equipment and personnel, or interruption of the processing or transportation of natural gas. Any sustained disruption in Renergen’s ability to meet Renergen’s obligations under Renergen’s sales agreements could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Renergen anticipates Renergen will require additional capital in the future, and no assurance can be given that such capital will be available at all or available on terms acceptable to Renergen.

Renergen expects its expenses to increase substantially in connection with our ongoing and planned activities, particularly as it continues to integrate acquired assets into Renergen and continues the development of Phase 2 of

8

 


the Virginia Gas Project. In addition, we expect to continue incurring significant costs associated with operating as a public company. For example, Renergen estimates that the build cost to complete construction of Phase 2 is in excess of $1.0 billion (including borrowing costs and general corporate costs during construction) over a period of three to four years. This is broken down into upstream, midstream and downstream costs. Historically, Renergen has financed these expenditures primarily with equity offerings. Renergen intends to use Renergen’s existing cash balance, available facilities and operating cash flows. However, the cost to complete construction of Phase 2 is subject to factors beyond Renergen’s control, including inflationary pressures, rising interest rates and associated monetary policies and increasing power shortages or blackouts, and Renergen’s financing needs may require Renergen to alter or increase Renergen’s capitalization substantially through the issuance of debt or equity securities or the sale of assets.

If Renergen is unable to fund Renergen’s planned capital expenditure projects as a result of Renergen’s operations being unable to generate sufficient cash flow or as a result of difficulties in raising debt or equity funding to support future capital expenditures and investments, Renergen may no longer be able to complete such projects. In addition, Renergen may be unable to develop new capital projects so as to continue production at cost-effective levels. Furthermore, any such reduction in Renergen’s ability to fund capital expenditures may result in significantly increased expenses to resume production or capital projects, or cause Renergen to forego resuming production or such capital projects at all, which could cause Renergen to forego any potential future increases in commodity prices and may adversely affect Renergen’s results of operations or financial condition.

Renergen’s capital expenditures financed by borrowing additional funds may increase Renergen’s leverage and make it more difficult for Renergen to satisfy Renergen’s obligations, limit Renergen’s ability to obtain additional financing to operate Renergen’s business, require Renergen to dedicate a substantial portion of Renergen’s cash flow to payments on Renergen’s debt and place Renergen at a competitive disadvantage relative to some of Renergen’s competitors. As of May 31, 2026, Renergen had total borrowings outstanding of $113.8 million, consisting of long-term borrowings from the DFC, IDC and Molopo Energy Limited (“Molopo”). The borrowings under the DFC Credit Facility Agreement (as defined below) and IDC Loan Agreement (as defined below) are payable on fixed payments terms, whereas the borrowings under the Molopo Debt Funding (as defined below), while payable in annual installments, are payable in an amount equivalent to 36% of Tetra4’s distributable profit, meaning the amount of Tetra4’s annual profit that is available to be paid as a dividend to its shareholders in a particular period. Renergen has received conditional approval for senior secured debt funding from the DFC of up to $535 million. In addition, the Standard Bank of South Africa has previously indicated their willingness to consider supporting Phase 2 with up to $250 million of senior secured debt funding. No binding definitive agreements have been executed with respect to either facility, and there can be no assurance that Renergen will be able to negotiate and enter into such agreements on terms that are favorable to Renergen, or at all. In addition, the Commitment Letter is non-binding and subject to a number of terms and conditions, contingencies and uncertainties. See “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Indebtedness-Conditional Indications of Support from the DFC and SBSA” for additional information regarding conditions precedent to funding by the DFC. If Renergen is unable to repay or refinance Renergen’s short- and long-term borrowings as they mature, such inability could have a material adverse effect on Renergen’s financial condition.

The DFC Credit Facility Agreement, IDC Loan Agreement and the Bridge Loan Facility Agreement contain, and Renergen’s existing and future debt and other agreements may contain, among other provisions, covenants that restrict Renergen’s ability to finance future operations or capital needs, engage in other business activities or declare dividends. Given the long-term nature of these agreements, these covenants and restrictions may present a material constraint on Renergen’s operational and strategic flexibility and may preclude Renergen from entering into strategic transactions that would be beneficial to Renergen. A breach of any of these covenants could result in an event of default or accelerate Renergen’s repayment obligations under the relevant agreement, and any such event of default or resulting acceleration under such agreements could result in an event of default or acceleration under other agreements.

Renergen’s capital expenditures financed by Renergen’s cash flow from operations and access to capital are subject to a number of variables, including the prices at which Renergen’s production is sold, Renergen’s proved reserves, the amount of LNG and helium Renergen is able to produce from existing wells, Renergen’s ability to locate and produce new reserves, the amount of Renergen’s operating expenses, Renergen’s borrowing ability and Renergen’s ability to access capital markets.

9

 


In addition, Renergen may have additional capital requirements to the extent Renergen identifies and decides to proceed or accelerate exploration activities, develop future operations, or take advantage of opportunities for acquisitions, joint ventures or other business opportunities. Renergen may also incur major unanticipated liabilities or expenses. There can be no assurance that Renergen will be able to obtain necessary financing for such activities in a timely manner and/or on acceptable terms, if at all.

Natural gas prices are volatile. A sustained decline in natural gas prices could adversely affect Renergen’s business, financial condition and results of operations and Renergen’s ability to meet Renergen’s capital expenditure obligations and financial commitments.

The prices Renergen receives for Renergen’s natural gas production heavily influence Renergen’s revenue, profitability, access to capital, and future rate of growth. Natural gas is a commodity, and its price may fluctuate widely in response to market uncertainty and to relatively minor changes in the supply of and demand for natural gas. Historically, natural gas prices have been volatile. For example, during the period from January 1, 2026 through June 30, 2026, the Henry Hub spot price for natural gas fluctuated significantly from a high of $30.72 per MMBtu on January 23, 2026 to a low of $2.54 per MMBtu on April 24, 2026. The prices Renergen receives for Renergen’s production, and the levels of Renergen’s production, depend on numerous factors beyond Renergen’s control, which include the following:

•
worldwide and regional economic conditions impacting the global supply and demand for natural gas;
•
the price and quantity of foreign imports of natural gas;
•
political and economic conditions in or affecting other producing regions or countries, including the Middle East, Africa, South America and Russia;
•
the level of global exploration, development and production of natural gas;
•
the level of global inventories of natural gas;
•
the proximity, capacity, cost and availability of gathering and transportation facilities;
•
localized and global supply and demand fundamentals and transportation availability;
•
the cost of exploring for, developing, producing and transporting reserves;
•
weather conditions and natural disasters;
•
technological advances affecting energy consumption;
•
the price and availability of alternative fuels;
•
expectations about future commodity prices;
•
energy supply, production, and conservation measures, including policies and initiatives by governmental authorities; and
•
governmental regulation and taxes.

Lower commodity prices may reduce Renergen’s cash flow and borrowing ability. If Renergen is unable to obtain needed capital or financing on satisfactory terms, Renergen’s ability to develop future reserves could be adversely affected. Also, using lower prices in estimating proved reserves may result in a reduction in proved reserve volumes due to economic limits. In addition, sustained periods with natural gas prices at levels lower than current Henry Hub strip prices may adversely affect Renergen’s drilling economics and Renergen’s ability to raise capital, which may require Renergen to re-evaluate and postpone or eliminate Renergen’s development program, and result in the reduction of some of Renergen’s proved undeveloped, probable and possible reserves and related PV-10. As a result, a substantial or extended decline in commodity prices may materially and adversely affect Renergen’s future business, financial condition, results of operations, liquidity and ability to finance planned capital expenditures.

The world’s helium supply is located in a few countries, which may cause volatility in helium prices, impact Renergen’s competition and affect Renergen’s business or results of operations.

Helium is a commodity business, which means that Renergen’s operations and earnings may be significantly affected by changes in helium prices and in margins on helium sales. Helium prices and margins on helium sales depend on local, regional and global events or conditions that affect supply and demand for helium. The world’s helium supply is located primarily in the United States, Algeria, and Qatar, in addition to South Africa, Russia and a few other countries. The scarcity of this resource limits the number of competitors in the helium industry and, if

10

 


Renergen’s competitors in any of these countries experience a problem with production of helium, the price of helium may spike. For example, an explosion at a Russian helium production facility in January 2022 caused a continued delay in production at that site and contributed to global helium supply concerns, which impacted the prices for the commodity. More recently, in early 2026, the closure of the Strait of Hormuz adversely impacted Qatar’s helium production, with repairs expected to take years rather than months, and in April 2026, Russia introduced export controls on helium to maintain domestic supply. Based on industry reports, approximately 50% of global helium supply is currently offline, while salt cavern storage facilities are approaching depletion. These developments have contributed to significant upward pressure on spot helium pricing, with spot prices exceeding $2,000/Mcf in some cases. However, there is no assurance that these conditions or elevated prices will be sustained, and helium prices could decline if such disruptions are resolved or if supply and demand conditions otherwise change. A resolution of disruptions, an increase in production or shipping capacity from producing countries, or a reduction in global demand could each cause helium prices to fall. Any material decline in helium prices could have a material adverse effect on certain of Renergen’s operations, especially in financial condition and proved reserves.

Scientific or technological changes, substitution, recycling or changes in end-user demand may reduce demand for helium, which could adversely affect Renergen’s business, financial condition and results of operations.

Helium demand may be affected by scientific and technological developments, changes in end-user demand, recycling, substitution of other gases or technologies, and the price sensitivity of certain helium applications. For example, technologies that reduce helium consumption in MRI machines, a shift in demand among electronics, aerospace, medical, fiber-optic, welding or other applications, or the development or increased use of substitutes for helium could reduce demand for Renergen’s helium. Significant increases in helium prices may also encourage customers to substitute other gases, increase investment in helium recycling or adopt technologies that reduce helium consumption. If demand for helium declines or if demand growth in emerging applications does not offset declines in other applications, Renergen’s business, financial condition, results of operations and prospects could be adversely affected.

Renergen faces competition based upon the international market price for LNG.

Renergen may be subject to the risk of LNG price competition when Renergen needs to replace any existing sale purchase agreement (“SPA”), whether due to natural expiration, default or otherwise, or enter into new LNG SPAs. Factors relating to competition may prevent Renergen from entering into a new or replacement SPA on economically comparable terms as existing SPAs, or at all. Such an event could have a material adverse effect on Renergen’s business, contracts, financial condition, operating results, cash flow, liquidity and prospects. Factors that may negatively affect potential demand for LNG from Renergen’s liquefaction projects are diverse and include, among others:

•
increases in worldwide LNG production capacity and availability of LNG for market supply;
•
LNG demand at levels below those required to maintain current price equilibrium with respect to supply;
•
increases in the cost to supply natural gas feedstock to Renergen’s liquefaction projects;
•
decreases in the cost of competing sources of natural gas or alternate fuels, such as coal, heavy fuel oil and diesel;
•
decreases in the price of non-South African LNG, including decreases in price as a result of contracts indexed to lower oil prices;
•
increases in capacity and utilization of nuclear power and related facilities; and
•
displacement of LNG by pipeline natural gas or alternate fuels, including in locations where access to these energy sources is not currently available.

Actual and potential supply chain shortages and increases in the prices of production inputs may have a material adverse effect on Renergen as Renergen expands its current operations.

Renergen’s results of operations have been and may in the future be affected by the availability and pricing of raw materials and other essential production inputs, including equipment, fuel and steel. The price and quality of raw materials have been and may in the future be substantially affected by changes in global supply and demand, along with weather conditions, including those due to climate change, governmental controls and other factors. A

11

 


sustained interruption in the supply of any of these materials could require Renergen to find substitute suppliers and to pay higher prices for such materials. Furthermore, the cost of construction materials and the prices of certain of Renergen’s production inputs are impacted by, among other things, the prices of such raw materials, including oil and steel, which have been, and may continue to be, subject to price volatility. The price of these materials may continue to rise as a result of inflation, resulting in significantly higher construction costs as Renergen expands its current operations into Phase 2. Any significant increase in the prices of these materials could increase Renergen’s operating costs and affect production considerations, which may have a material adverse effect on Renergen’s operations and liquidity.

Renergen depends on third parties to manufacture and to supply key semiconductor components necessary for operations at the Virginia Gas Plant. If these third-party suppliers become unwilling or unable to provide an adequate supply of semiconductors, with respect to which there is a global shortage, Renergen may not be able to find alternative sources in a timely manner and Renergen’s business could be adversely impacted.

Semiconductors are a vital input to certain components of Renergen’s Virginia Gas Plant. Many of the key semiconductors used in these components come from limited or single sources of supply, and, therefore, a disruption with any one manufacturer or supplier in Renergen’s supply chain would have an adverse effect on Renergen’s ability to continue Renergen’s operations. Due to Renergen’s reliance on these semiconductors, Renergen is subject to the risk of shortages and long lead times in their supply. Renergen has in the past experienced, and may in the future experience, semiconductor shortages, and the availability and cost of these components would be difficult to predict. For example, a global shortage of semiconductors has been reported since early 2021, and Renergen is unsure as to when, or if, such shortage will be resolved. To the extent such shortage persists, Renergen’s business could be adversely impacted. Additionally, Renergen’s manufacturers may experience temporary or permanent disruptions in their manufacturing operations due to equipment breakdowns, labor strikes or shortages, natural disasters, component or material shortages, cost increases, acquisitions, insolvency, changes in legal or regulatory requirements, or other similar problems, further exacerbating the global shortage. The shortage of semiconductors could negatively impact Renergen’s ability to source an adequate supply of semiconductors used in Renergen’s operations, which may adversely affect Renergen’s business, results of operations and financial condition.

The ongoing military conflict between Russia and Ukraine and the United States-Israel-Iran conflict could have a material adverse effect on the global energy industry and Renergen’s business, financial condition and results of operations.

The current conflict between the United States, Israel and Iran has highlighted the global dependency on the supply of petroleum, natural gas and helium from countries bordering the Perian Gulf. Not only has this conflict highlighted the concentration of suppliers, but more importantly the concentration of risk associated with transport routes to market for these critical products.

In addition, in response to the Russian invasion of Ukraine in February 2022, the United States, the European Union and the United Kingdom, among others, have imposed export controls on certain products and financial and economic sanctions on certain industry sectors and parties in Russia (for example, Helium). Although Renergen has no operations in Russia or Ukraine, Renergen has experienced shortages in materials and increased costs for transportation, energy, and raw materials due in part to the negative impact of the Russia-Ukraine military conflict on the global economy. The long-term impact on Renergen’s business resulting from the disruption of trade in the region caused by the conflict and associated sanctions is uncertain at this time due to the fluid nature of the ongoing military conflict and response. The potential impacts include supply chain and logistics disruptions, financial impacts including volatility in foreign exchange and interest rates, increased inflationary pressure on raw materials and energy, and other risks, including an elevated risk of cybersecurity threats and the potential for further sanctions.

The continuation of the abovementioned conflicts may trigger a series of additional economic and other sanctions enacted by the United States and other countries. The potential impact of supply chain and logistics disruptions, financial impacts, including volatility in helium and LNG prices, foreign exchange rates and interest rates, inflationary pressures on raw materials and energy and heightened cybersecurity threats, is uncertain at the current time due to the fluid nature of the conflict and international responses to it. To the extent any international conflict may adversely affect Renergen’s business, it may also have the effect of heightening many of the other risks

12

 


described in Renergen’s risk factors, such as those relating to data security, supply chain, volatility in prices of inputs, and market conditions, any of which could negatively affect Renergen’s business and financial condition.

Although Renergen monitors developments in international relations to assess any potential future impacts that may arise, Renergen cannot provide assurance that Renergen will not be impacted by any current or future international conflict. The adverse effects of the ongoing conflict between Russia and Ukraine and the United Staes, Israel and Iran, and/or economic sanctions and import and/or export controls to be imposed on the Russian and Iranian governments by the United States or others, and the above-mentioned adverse effect on the global economy and market conditions could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Renergen may be unable to obtain, maintain or renew permits, leases or licenses necessary for Renergen’s operations, the failure of which could impair Renergen’s ability to conduct Renergen’s operations and have a material adverse effect on Renergen’s results of operations.

Renergen’s operations require Renergen to obtain a number of consents, permits, authorizations, leases and licenses that may impose strict regulations on various environmental and operational matters. These include consents issued by various agencies and regulatory bodies. The permitting rules, and the interpretations of these rules, are complex, change frequently and are subject to discretionary interpretations by Renergen’s regulators, all of which may make compliance difficult or impractical and may impair Renergen’s existing operations or the development of future facilities. Although Renergen believes that Renergen has obtained all consents, permits, authorizations, leases and licenses to operate Renergen’s operations to date, if any consents, permits, authorizations, leases and licenses that may be required for future operations are not issued or timely renewed as statutorily prescribed or at all, or are conditioned in a manner that may restrict Renergen’s ability to conduct Renergen’s operations economically, Renergen’s cash flows may decline, which could negatively impact Renergen’s operations and results of operations.

Renergen’s results of operations may be adversely affected by permitting, operating or construction delays and requirements introduced via community, political or regulatory opposition to Renergen’s projects.

Certain persons, associations and groups could oppose natural gas or helium projects in general or Renergen’s projects specifically, citing, for example, misuse of water resources, contribution to climate change, landscape degradation, land use or price increase and harm to the environment. Moreover, regulation may restrict the development of LNG or helium plants in certain areas. In order to develop an LNG or helium project, Renergen is typically required to obtain, among other things, petroleum rights to explore and/or produce LNG and helium, environmental authorizations, water use entitlements, and/or other related authorizations, land use, zoning and/or other infrastructure-related building permits, which in turn require environmental impact and applicable specialist studies to be undertaken and mandatory prescribed public participation processes, during which any interested or affected individual, association or group may oppose a project or expansion of an existing project. Any objection resulting from the public participation process must be taken into account by the relevant decision-making authority, which could in turn result in the applicable consents being delayed or not being granted or being granted solely on the condition that Renergen carry out certain mitigation measures regarding the impact of the proposed project. Objections to Renergen’s application for the relevant consents, successful appeal and/or judicial review challenges in respect to the granting of Renergen’s applicable consents could adversely affect Renergen’s operating plans.

Authorization for the use, construction, and operation of systems and associated transmission facilities will also require the assessment and evaluation of existing limited real rights of third parties, such as mineral rights, private rights-of-way, and other easements; environmental, agricultural, traditional community entitlements, cultural, recreational, and aesthetic impacts; biodiversity loss, and the likely mitigation of adverse effects to these and other resources and uses. The inability to obtain the required consents and other governmental approvals, and any delays in obtaining such consents and other related approvals due, for example, to applicant or third-party internal appeals and litigation, could potentially prevent Renergen from successfully constructing and operating such projects in a timely manner and could result in the potential forfeiture of any deposit Renergen has made with respect to a given project. Moreover, project approvals subject to project modifications and conditions, including mitigation requirements and costs, could affect the financial success of a given project. Changing regulatory

13

 


requirements and the discovery of unknown site conditions could also adversely affect the financial success of a given project.

Further, Renergen may be adversely affected by operating or construction delays. Due to the size and duration of construction in Phase 2, actual construction costs may be significantly higher than Renergen’s current estimates as a result of many factors, including but not limited to changes in scope, the ability of Renergen’s contractors to execute successfully under their agreements, changes in commodity prices, escalating labor costs and the potential need for additional funds to be expended to maintain construction schedules or comply with existing or future environmental or other regulations. As construction progresses, Renergen may decide or be forced to alter operations or Renergen’s construction plans due to unforeseen events, which could result in longer construction periods, higher construction costs or both, including change orders to comply with existing or future environmental or other regulations. For example, Renergen’s Phase 1 liquid helium plant has undergone engineering optimization and entered its commissioning phase in August 2026, with commercial liquid helium delivery expected during the fourth quarter of 2026. Unanticipated technical issues during commissioning could cause further delays. Any significant operating or construction delay, whatever the cause, could have a material impact on Renergen’s business, financial condition, results of operations or liquidity.

Poor general economic, business, or political conditions may have a material adverse effect on Renergen’s results of operations, liquidity, and financial condition.

Renergen’s current business plan contemplates that a portion of Renergen’s revenue will be derived from the sale of helium and LNG. The demand for helium and LNG is largely driven by the economic, political and regulatory conditions of the countries where Renergen plans to sell such commodities (for example, the U.S. and South Africa). Therefore, Renergen’s results of operations and financial condition are, to a large extent, dependent upon the overall level of economic activity in these countries.

During the last few years, concerns over inflation, energy costs, volatile oil and natural gas prices, geopolitical issues, the availability and cost of credit, rising interest rates, the overall health of the banking sector, the slowdown in economic growth in large emerging and developing markets, regional or worldwide increases in tariffs or other trade restrictions, and other issues have contributed to increased economic uncertainty and diminished expectations for the global economy.

Concerns about global economic conditions have had a significant adverse impact on domestic and international financial markets and commodity prices. If uncertain or poor economic, business, or industry conditions in the United States or abroad remain prolonged, demand for petroleum products could diminish or stagnate, and production costs could increase. These situations could impact the price at which Renergen can sell Renergen’s LNG and helium, affect Renergen’s vendors’, suppliers’, and customers’ ability to continue operations, and ultimately adversely impact Renergen’s business, financial condition, results of operations or liquidity.

If Renergen loses senior management or is unable to hire and/or retain sufficient technically skilled and experienced employees, Renergen’s business may be materially adversely affected.

Renergen’s ability to continue to operate, innovate, improve or expand depends on, among other things, Renergen’s ability to retain and attract senior management and key employees with appropriate knowledge and skills, experience and other competencies as may be required to be competitive and to achieve Renergen’s business strategies over the long term. However, the energy industry in South Africa continues to experience a shortage of qualified senior management and technically skilled employees. Renergen may be unable to hire or retain (due to departure or unavailability) appropriate senior management, technically skilled and experienced employees or other management personnel, or Renergen may have to pay and/or award higher levels of remuneration (including sign-on packages, gross packages and short- and long-term incentives) than Renergen currently provides to its employees. To the extent that Renergen is unable to hire or retain appropriate management and technically skilled personnel, or if there are not adequate succession plans in place, this could have a material adverse effect on Renergen’s business and on Renergen’s production levels, operating results and financial position. Renergen’s inability to hire or retain appropriate management and technically skilled personnel from designated groups may also affect Renergen’s

14

 


compliance with Renergen’s employment equity obligations and the undertakings that Renergen has made in Renergen’s social and labor plan in respect of the employment of historically disadvantaged persons.

Extreme weather and changing climatic conditions exacerbated by climate change impacts, including prolonged droughts, could lead to delays in Renergen’s projects and adversely affect Renergen’s operations.

Renergen’s operations are subject to various physical weather and climate risks, which may be exacerbated by climate change. Climate change may result in the increased frequency or severity of extreme weather events (including storms, droughts, floods, and wildfires) or changes in meteorological and hydrological patterns, which could adversely impact Renergen’s operations and financial results through, for example, water use curtailments in response to drought or construction delays resulting from more frequent storms and flooding. Renergen takes proactive measures to monitor water availability and quality within Renergen’s operations to help avoid and mitigate impacts to Renergen’s operations. In addition, the occurrence of extreme weather events has the potential to result in supply chain disruptions. While extreme weather events have increased in frequency and intensity in some areas where Renergen operates, to date such events have not had a material impact on Renergen’s operations nor materially adversely affected Renergen’s business.

Renergen’s reserves data are estimates based on assumptions that may be inaccurate and are based on existing economic and operating conditions that may change in the future, which could materially and adversely affect the quantities and value of Renergen’s reserves.

Renergen’s reserve estimates and the present value of future net cash flows from Renergen’s proved, probable and possible reserves, or PV-10, may vary substantially from the actual amounts Renergen is able to recover economically from Renergen’s reserves. The process of estimating natural gas and helium reserves is complex. There are numerous uncertainties inherent in estimating quantities of reserves, including many factors beyond Renergen’s control. Estimates of reserves require interpretations of available technical data and necessarily depend upon a number of variables and assumptions, any one of which may, if incorrect, result in an estimate that varies considerably from actual results. Any significant inaccuracies in these interpretations or assumptions could materially affect the estimated quantities and present value of Renergen’s reserves. These factors and assumptions relate to, among other aspects:

•
successful completion of Phase 2, on time and on budget;
•
future prices, production costs, capital expenditures and transportation costs;
•
the effects of regulation by governmental agencies; and
•
geologic conditions, which may not be identified by available exploration data and may differ from Renergen’s experiences in areas where Renergen currently produces.

You should not assume that the present value of future net revenues from Renergen’s reserves is the current market value of Renergen’s estimated reserves. Actual production, revenue and expenditures with respect to Renergen’s reserves will likely vary from Renergen’s estimates, and these variations may be material.

Further, any delays in the timing or increased costs of construction with respect to Phase 2 could result in reserve write-downs, which could materially affect Renergen’s PV-10, business, operating results and financial condition.

The PV-10 of Renergen’s estimated proved, probable and possible reserves is not necessarily the same as the current market value of Renergen’s estimated natural gas and helium reserves.

The PV-10 of Renergen’s estimated proved, probable and possible reserves may not be the current market value of Renergen’s estimated natural gas and helium reserves. In accordance with rules established by the SEC, Renergen bases the estimated discounted future net cash flows from Renergen’s reserves on contract prices, calculated as costs in effect on the date of the estimate, holding the prices and costs constant throughout the life of the properties. Actual future prices and costs may differ materially from those used in the net present value estimate, and future net present value estimates using then current prices and costs may be significantly less than the current estimate. In addition, the 10% discount factor Renergen uses when calculating discounted future net cash flows may

15

 


not be the most appropriate discount factor based on interest rates in effect from time to time and risks associated with Renergen or the natural gas and helium industry in general.

Power stoppages, fluctuations, usage constraints and limited access to sufficient water may force Renergen to halt or curtail operations and/or increase costs.

Renergen’s operations are dependent on electricity supplied by Eskom, a state-owned utility company that historically has held a monopoly over electricity supply in the South African market. Over the past decade, electricity supply in South Africa has been constrained, with multiple power supply disruptions and load shedding constraints, which is a controlled process of restricting the electricity supply in response to unplanned events that commenced in South Africa in 2008. For example, after a strike at Eskom in June 2018, Eskom re-commenced load shedding to protect the power system from going offline. In 2022 and 2023, Eskom increased implementation of load shedding due to various constraints on its power generation units, which have resulted in certain unplanned outages. Although the position has materially improved since 2024, load shedding may return in the short- to medium-term, particularly as the South African economy may increase growth under the GNU. Later in the decade, Eskom will also start to decommission some of its coal-fired power plants. Despite Eskom’s efforts to protect the national power grid to date, there is no assurance that Eskom’s efforts will prevent a nationwide blackout. Eskom has been unable to generate and supply the amount of electricity required by South Africa, which has resulted in significant and often unpredictable electricity supply disruptions. Eskom has implemented a number of short- and long-term mitigation plans to correct these issues but supply disruptions have continued to occur regularly and with no predictability. Prolonged power outages, disruptions, or shortages in supply of electricity to Renergen’s operations would have a material adverse impact on production and Renergen’s results of operations.

Eskom has increasing costs of generation emanating from, among others, primary energy costs such as high diesel consumption related to its use of peaking power plants to supplement the shortfall in base load generation, reduced generation of electricity from its base load fleet as a result of a very low energy availability factor at its old power stations, operating costs and asset related revenue recovery. Eskom is required to submit regular applications to the National Energy Regulator of South Africa (“NERSA”), an independent regulatory body, in accordance with, among others, the principles set out in the Electricity Regulation Act, 2006 (Act No. 4 of 2006) requesting an increase in the power tariffs. Each tariff increase request, if granted by NERSA, results in higher energy costs for electricity users in South Africa, including Renergen. NERSA has approved an 8.76% increase in electricity tariffs for the period from April 1, 2026 to March 31, 2027, with a further increase of 8.86% to take effect in April 2027. Eskom has expressed concern that these increases may not be adequate to prevent future electricity interruptions and has indicated that it intends to challenge NERSA’s decision not to grant the requested tariff increase. In several instances, the court has ruled in Eskom’s favor, allowing retrospective recovery through tariff increases. It is anticipated that Eskom will pursue further tariff increase applications, which will result in further tariff uncertainty and price increases. During certain periods of load shedding, Eskom has burned significant amounts of diesel to run its gas turbines and has asked large power users to curtail their demand. This has contributed to Eskom’s ongoing financial difficulties and above inflation tariff applications to NERSA. Although as of September 18, 2026, South Africa has gone 490 consecutive days without load shedding, there is no guarantee that load shedding will not return.

Furthermore, in February 2019, the President of South Africa announced the vertical unbundling of Eskom. While full state ownership will be maintained, the unbundling is expected to result in the separation of Eskom’s generation, transmission and distribution functions into separate entities, which may require legislative and/or policy reform, which could take a significant amount of time and could cause poor reliability of the supply of electricity, instability in prices, and a possible tariff increase above inflation that could continue through the unbundling process. Should Renergen experience further power tariff increases, Renergen’s operating results and financial condition may be adversely impacted.

Although the South African Department of Electricity and Energy is developing a recovery program to improve the reliability of power supply in South Africa, with significant success in 2024 to date, there can be no assurance that this program will provide sufficient supply for the needs of the country or for Renergen to run Renergen’s operations at full capacity or at all.

16

 


Renergen’s operations also require significant amounts of water. Renergen is dependent on the availability of water in Renergen’s areas of operations and, in particular, on the provision of a sufficient allocation of water to enable Renergen to conduct Renergen’s business. Renergen’s operations are located in historically water scarce areas, which such scarcity may be further impacted by climate change. Renergen’s current water supply to Renergen’s facilities and Renergen’s operations comes directly from the municipal main supply system, which also supplies the mining houses in the area and historically has not been prone to supply constraints. This municipal main supply system would also be the main source of water supply for Phase 2 of the Virginia Gas Project. Renergen’s on-site service water tank has sufficient water storage should unplanned service interruptions occur. Additionally, Phase 1 and Phase 2 of the Virginia Gas Project are designed for efficient water usages, including the recycling of produced water from plant operation wastewater and the recycling of treated sewage waste. However, shifting rainfall patterns, population growth and urban development in the areas surrounding Renergen’s operations are expected to lead to increased demands on the existing water supply, which, coupled with inadequate upgrades to existing water infrastructure, may cause water shortages in relation to Renergen’s areas of operations. If Renergen cannot be supplied with sufficient water, Renergen’s results of operations and financial condition may be adversely impacted.

A cyber-attack could result in operational interruptions or the infringement of sensitive data, financial loss, and negative impacts on reputation.

A cyber-attack on Renergen could result in operational interruptions or the infringement of sensitive data, financial loss, and negative impacts on reputation. Renergen uses a variety of information technology systems in the ordinary course of business, which are potentially vulnerable to unauthorized access, computer viruses, ransomware software viruses and other similar types of malicious activities and cyber-attacks, including cyber-attacks to Renergen’s information technology infrastructure and attempts by others to gain access to Renergen’s propriety or sensitive information, which range from individual attempts to advanced, persistent threats. These attacks, and, in particular, ransomware attacks, such as the Colonial Pipeline ransomware incident in May 2021, have become increasingly frequent and sophisticated globally, with attractive returns for criminals. The procedures and controls Renergen uses to monitor these threats and mitigate Renergen’s exposure may not be sufficient to prevent cybersecurity incidents. The results of these incidents could include misstated financial data, theft of trade secrets or other intellectual property, liability for disclosure of confidential customer, supplier or employee information, increased costs arising from the implementation of additional security protective measures, litigation and reputational damage, which could materially adversely affect Renergen’s financial condition, business or results of operations. Any remedial costs or other liabilities related to cyber-attacks may not be fully insured or indemnified by other means.

The large-scale outbreak of infectious diseases could severely impact Renergen’s business, financial condition, results of operations, prospects and workforce.

The large-scale outbreak of infectious diseases increases morbidity and mortality over a wide geographic area, which could lead to a significant economic, social and political disruption in the areas in which Renergen operates. If another pandemic or large-scale outbreak of another infectious disease were to arise, Renergen would have to re-apply for this designation and no assurance can be made that the South African government would approve such designation for such other pandemic or large-scale outbreak of another infectious disease.

Volatile macroeconomic conditions, such as fluctuating foreign exchange and rising inflation rates, may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity.

Volatile macroeconomic conditions, such as fluctuating foreign exchange and rising inflation rates, may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity. For example, in fiscal year 2026, Renergen recognized approximately $8.3 million of net foreign exchange gains, principally from the remeasurement of U.S. dollar-denominated debt and supplier balances, compared to total revenue of approximately $2.6 million. Because a substantial portion of Renergen’s debt is denominated in U.S. dollars while its functional currency is the South African Rand, exchange rate movements may continue to have a

17

 


disproportionate effect on Renergen’s reported results, and in certain periods foreign exchange effects may obscure the underlying operating performance of Renergen’s business.

Furthermore, LNG is marketed in South Africa as a substitute / alternative for diesel fuel. It is priced at a discount to wholesale diesel fuel. Because diesel fuel prices are highly correlated with the Brent crude oil price, increases or decreases in the price of crude oil impact Renergen’s sales accordingly. Historically, the increasing cost of diesel fuel in South Africa has outstripped the domestic inflation rate. In addition, if exchange rates or interest rates, such as the SOFR, or any replacement benchmark rate, and the South African prime interest rate, increase significantly, Renergen’s finance expenses will increase, and Renergen’s ability to obtain financing may decrease, which may materially adversely affect Renergen’s results of operations. South Africa’s central bank, the South African Reserve Bank, controls the repurchase rate, which is the rate at which the South African Reserve Bank lends to South African banks. The repurchase rate in turn determines the South African prime interest rate, which is the rate at which South African banks will lend to customers like Renergen. Fluctuations in exchange rates and interest rates are caused by several factors that are beyond Renergen’s control, such as local and international central bank policy changes, geopolitical shift, global economic factors and others. Such volatile macroeconomic conditions may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity.

If Renergen fails to comply with its obligations under license or technology agreements with third parties, Renergen may be required to pay damages and could lose license rights that are critical to its business.

Renergen licenses certain intellectual property rights, including technologies and data from third parties, which are important to Renergen’s business, and, in the future, Renergen may enter into additional agreements that provide Renergen with licenses to valuable intellectual property rights or technology. For example, Renergen currently licenses satellite vegetation stress analyses software, detailed sub-surface modeling software, advanced DCS, SCADA or PLC systems and software, as well as hardware related licenses for specialist cryogenic equipment. Renergen’s future technological needs may be subjected to proprietary licensing requirements.

If Renergen fails to comply with any of the obligations under Renergen’s license agreements, Renergen may be required to pay damages and the licensor may have the right to terminate the license. Termination by the licensor would cause Renergen to lose valuable rights and could prevent Renergen from selling Renergen’s products and services, or inhibit Renergen’s ability to commercialize future products and services. Renergen’s business would suffer if any current or future licenses terminate, if the licensors fail to abide by the terms of the license, if the licensors fail to enforce licensed patents against infringing third parties, if the licensed intellectual property rights are found to be invalid or unenforceable, or if Renergen is unable to enter into necessary licenses on acceptable terms. In addition, Renergen’s rights to certain technologies are licensed to Renergen on a non-exclusive basis. The owners of these non-exclusively licensed technologies are therefore free to license them to third parties, including Renergen’s competitors, on terms that may be superior to those offered to Renergen, which could place Renergen at a competitive disadvantage. Moreover, Renergen’s licensors may own or control intellectual property rights that have not been licensed to Renergen and, as a result, Renergen may be subject to claims, regardless of their merit, that Renergen is infringing, misappropriating or otherwise violating the licensor’s rights. In addition, the agreements under which Renergen licenses intellectual property rights or technology from third parties are generally complex, and certain provisions in such agreements may be susceptible to multiple interpretations. The resolution of any contract interpretation disagreement that may arise could narrow what Renergen believes to be the scope of Renergen’s rights to the relevant intellectual property rights or technology, or increase what Renergen believes to be Renergen’s financial or other obligations under the relevant agreement. Any of the foregoing could have a material adverse effect on Renergen’s competitive position, business, financial condition, and results of operations.

Renergen may not be successful in obtaining, maintaining, enforcing, defending and protecting Renergen’s intellectual property and other proprietary rights, products or processes, including Renergen’s unpatented proprietary knowledge and trade secrets, or in avoiding claims that Renergen infringed, misappropriated or otherwise violated the intellectual property rights of others.

Renergen’s business and Renergen’s ability to compete effectively depend on Renergen’s ability to obtain, maintain, defend, protect and enforce Renergen’s intellectual property rights, confidential information, know-how

18

 


and other proprietary rights, products or processes. Renergen relies on intellectual property laws in South Africa and other countries, as well as confidentiality procedures, cybersecurity practices and contractual provisions and restrictions, to protect the intellectual property rights and other proprietary rights relating to Renergen’s products, proprietary processes and proprietary technology. Despite Renergen’s efforts to obtain, maintain, defend, protect and enforce Renergen’s intellectual property rights and other proprietary rights, products or processes, there can be no assurance that these protections will be available in all cases or will be adequate to prevent Renergen’s competitors or other third parties from copying, accessing or otherwise obtaining and using Renergen’s technology, intellectual property rights or other proprietary rights, products or processes without Renergen’s permission. Further, there can be no assurance that Renergen’s competitors will not independently develop products or processes that are substantially equivalent or superior to Renergen’s or design around Renergen’s intellectual property rights and other proprietary rights. In each case, Renergen’s ability to compete could be significantly impaired.

Renergen may, over time, increase Renergen’s investment in protecting Renergen’s intellectual property rights through patent, trademark, copyright and other intellectual property filings, which could be expensive and time-consuming. Renergen may not be able to obtain registered intellectual property protection for Renergen’s products or processes, and, even if Renergen is successful in obtaining effective patent, trademark, trade secret and copyright protection, it is expensive and time-consuming to maintain, and defend, these rights in terms of application and maintenance costs. Moreover, Renergen’s failure to develop and properly manage new intellectual property rights could hurt Renergen’s market position and business opportunities.

In addition, these measures may not be sufficient to offer Renergen meaningful protection or provide Renergen with any competitive advantages. Renergen will not be able to protect Renergen’s intellectual property rights if Renergen is unable to enforce Renergen’s rights or if Renergen does not detect unauthorized use of Renergen’s intellectual property rights. Moreover, any changes in, or unexpected interpretations of, intellectual property laws may compromise Renergen’s ability to enforce Renergen’s trade secrets, intellectual property rights and other proprietary rights. If Renergen is unable to adequately protect Renergen’s intellectual property rights and other proprietary rights, Renergen’s competitive position and Renergen’s business could be harmed, as third parties may be able to commercialize and use products and technologies that are substantially the same as Renergen’s products and technologies to compete with Renergen without incurring the development and licensing costs that Renergen has incurred. Any of Renergen’s owned or licensed intellectual property rights could be challenged, invalidated, circumvented, infringed, misappropriated or violated, Renergen’s trade secrets and other confidential information could be disclosed in an unauthorized manner to third parties, or Renergen’s intellectual property rights may not be sufficient to permit Renergen to take advantage of current market trends or to otherwise provide Renergen with competitive advantages, which could result in costly redesign efforts, discontinuance of some of Renergen’s product offerings or other competitive harm.

Renergen believes that Renergen has sufficient intellectual property rights to allow Renergen to conduct Renergen’s business without incurring liability to third parties. However, Renergen or Renergen’s products may nonetheless infringe, misappropriate or otherwise violate the intellectual property rights of third parties, or Renergen may determine in the future that Renergen may be required to enter into costly license agreements or require other rights to intellectual property rights held by third parties. Such a license or other rights may not be available to Renergen on commercially reasonable terms or at all, in which case Renergen may be prevented from using, providing or manufacturing certain products or services, as applicable, or using brands as Renergen sees fit. Renergen may in the future become involved in lawsuits to protect or enforce Renergen’s intellectual property rights. An adverse result in any litigation proceeding could harm Renergen’s business.

Renergen’s holding company structure makes Renergen dependent on the operations of Renergen’s subsidiaries.

Renergen is a holding company and Renergen’s subsidiaries conduct all of Renergen’s operations and own all of Renergen’s operating assets. Renergen’s material assets are its direct equity interests in Tetra4. Renergen has no independent means of generating revenue. Renergen is, therefore, dependent on payments, dividends and distributions from its subsidiaries for funds to pay Renergen’s operating and other expenses and to pay future cash dividends or distributions, if any, to holders of the ordinary shares, and Renergen may have tax costs in connection with any dividend or distribution. In addition, the ability of Renergen’s subsidiaries to make distributions to Renergen may be restricted by, among other things, loans, credit facilities and applicable laws and regulations. If Renergen is unable to obtain funds from Renergen’s subsidiaries, Renergen may not be able to pay future dividends

19

 


or distributions, if any, to holders of the ordinary shares, or to pay interest or principal on any debt Renergen may incur when due.

The historical financial results of Renergen may not be indicative of what Renergen’s actual financial position or results of operations will be in future periods.

The historical financial results of Renergen may not be indicative of the financial condition, results of operations or cash flows that Renergen may achieve in the future. This is primarily the result of the fact that Renergen only recently entered the production phase of Phase 1 of the Virginia Gas Project and Phase 2 is ongoing. Renergen’s financial condition and future results of operations could be materially different from amounts reflected in the historical financial statements, so it may be difficult for investors to compare Renergen’s future results to historical results or to evaluate Renergen’s relative performance or trends in Renergen’s business.

Strikes, riots and labor disruptions can damage economic growth and, in turn, negatively impact Renergen’s business.

Strikes, riots and labor disruptions can damage economic growth and, in turn, lead to loss of production and/or interruption of Renergen’s operations. In the first half of 2022, South Africa lost 1.6 million work days due to strikes among industrial workers (based on estimated participants in the strikes), which was more than thirty times higher than the same prior year period. In August 2022, eight South African workers’ unions joined to protest power cuts, rising costs of living, and high unemployment levels. Renergen could suffer supply chain disruptions due to any labor disputes, slowdowns or shutdowns that may occur. For example, during the height of the COVID-19 pandemic due to government enforced lockdowns, Renergen suffered project delays for various components of Renergen’s gas gathering system, balance of plant utilities and LNG and liquid helium processing plant because of supply chain challenges. Renergen also experienced a two to three times increase in shipping transit times from China, Europe and the U.S. to South Africa, which exacerbated many of Renergen’s project delays. Additionally, South Africa experienced a period of political unrest in July 2021 as a result of the sentencing of the former President Jacob Zuma for contempt of court, which led to significant labor disruptions in the regions of Kwa-Zulu Natal and Gauteng. While there have not been any significant labor strikes in recent years, the political environment could change rapidly, and any labor strikes, riots and/or labor disruptions may negatively impact Renergen’s employment relationships and could increase Renergen’s risk exposure, which in turn could negatively impact on Renergen’s results of operations and financial condition.

Drilling for and producing natural gas and helium are high risk activities with many uncertainties that could adversely affect Renergen’s financial condition or results of operations.

Renergen’s drilling activities are subject to many risks, including the risk that they will not discover commercially productive reservoirs. Drilling for natural gas and helium can be uneconomical, not only from dry holes, but also from productive wells that do not produce sufficient revenues to be commercially viable. There is no way to predict in advance of drilling and testing whether any particular prospect will yield natural gas or helium in sufficient quantities to recover drilling or completion costs or to be economically viable. The use of micro-seismic data and other technologies and the study of producing fields in the same area will not enable Renergen to know conclusively prior to drilling whether natural gas or helium will be present or, if present, whether natural gas or helium will be present in commercial quantities. Renergen cannot assure you that the analogies Renergen draws from available data from other wells will be applicable to Renergen’s drilling prospects. In addition, drilling and producing operations on Renergen’s acreage may be curtailed, delayed or canceled as a result of other factors, including:

•
declines in natural gas or helium prices;
•
infrastructure limitations;
•
the high cost of, shortages in or delays with respect to receipt of equipment, materials and services;
•
unexpected operational events, pipeline ruptures or spills, adverse weather conditions, facility malfunctions or title problems;
•
compliance with environmental and other governmental requirements;
•
regulations, restrictions, moratoria and bans on injection wells and water disposal;
•
unusual or unexpected geological formations;

20

 


•
environmental hazards, such as natural gas or well fluids spills or releases, pipeline or tank ruptures and discharges of toxic gas;
•
fires, blowouts, craterings and explosions;
•
uncontrollable flows of natural gas or well fluids;
•
changes in the cost of decommissioning or plugging wells;
•
maintenance of quality, purity and thermal quality standards both for commodity sales and purposes of transportation;
•
members of the public have engaged in physical confrontations or acts of sabotage to impede or prevent transportation of hydrocarbons; and
•
pipeline capacity curtailments.

In addition to causing curtailments, delays and cancellations of drilling and producing operations, many of these events can cause substantial losses, including personal injury or loss of life, damage to or destruction of property, natural resources and equipment, pollution, environmental contamination, loss of wells and regulatory penalties. The occurrence of an event that is not fully covered by insurance could have a material adverse impact on Renergen’s business activities, financial condition and results of operations.

The development of Renergen’s proved undeveloped, probable and possible reserves may take longer and may require higher levels of capital expenditure than Renergen currently anticipates. Therefore, Renergen’s proved undeveloped, probable and possible reserves may not be ultimately developed or produced.

Approximately 97.9% of Renergen’s estimated net proved reserves volumes for each of natural gas and helium were classified as proved undeveloped ("PUD") as of February 28, 2026. Development of these reserves may take longer and require higher levels of capital expenditure than Renergen currently anticipates. Moreover, the development of Renergen’s probable and possible reserves will require additional capital expenditures and are less certain to be recovered than proved reserves. Estimated future costs relating to the infill drilling of Renergen’s natural gas and helium PUDs and constructing required infrastructure at February 28, 2026 are approximately $92 million in the aggregate. Renergen expects to fund these expenditures through cash flows generated by operations, borrowings under the DFC Credit Facility Agreement, the IDC Loan Agreement and other sources of capital, including senior secured debt funding from the DFC and the Standard Bank of South Africa. As of May 31, 2026, Renergen has not included any costs relating to the development of Renergen’s probable and possible reserves in Renergen’s estimated future budget over the next five years. Renergen’s ability to fund development expenditures is subject to a number of risks. Delays in the development of Renergen’s reserves, increases in costs to drill and develop such reserves or decreases in commodity prices will reduce the value of Renergen’s estimated PUDs and future net revenues estimated for such reserves and may result in some projects becoming uneconomic. In addition, delays in the development of reserves could cause Renergen to reclassify Renergen’s PUDs as unproved reserves. Furthermore, there is no certainty that Renergen will be able to convert Renergen’s PUDs to developed reserves or Renergen’s probable and possible reserves into proved reserves or that Renergen’s undeveloped or unproved reserves will be economically viable or technically feasible to produce.

Further, SEC rules require that, subject to limited exceptions, PUDs may only be booked if they relate to wells scheduled to be drilled within five years after the date of booking. This requirement has limited and may continue to limit Renergen’s ability to book additional PUDs as Renergen pursues its drilling program. As a result, Renergen may be required to write down Renergen’s PUDs if Renergen does not drill those wells within the required five-year timeframe.

Renergen uses information, communication, and technology systems, which record personal information. Failure of these systems, or the failure to protect personal information, could impact Renergen’s business and operations.

Renergen receives, generates, stores and otherwise processes sensitive information, such as personal information. Renergen faces a number of risks relative to protecting this critical information, including loss of access risk, inappropriate use or disclosure, inappropriate modification, and the risk of Renergen being unable to adequately monitor, audit and modify Renergen’s controls over Renergen’s critical information. This risk extends to the third-party vendors and subcontractors Renergen uses to manage this sensitive data.

21

 


The right to privacy of both natural and juristic persons (including companies) is regulated by the Protection of Personal Information Act, 2013 (the “POPIA”), which works alongside the Promotion of Access to Information Act, 2000 (the “PAIA”). With effect from July 1, 2021, a “responsible party” must ensure that it processes personal information of another (known as a “data subject”) in accordance with the principles contained in the POPIA. The “processing” of personal information refers to any operation or activity concerning such personal information and includes collection, storage, use, alteration, retrieval (amongst others). In addition, the POPIA includes provisions relating to the processing of “special personal information,” which includes information concerning a data subject’s religious or philosophical beliefs, race or ethnic origin, trade union membership, political persuasion, health or sex life and criminal behavior or biometric information. The POPIA would apply to the “processing” of personal information relating to Renergen’s employees, customers, suppliers, shareholders and service providers. It also regulates the transfer of personal information outside South Africa by Renergen and the processing of personal information for a responsible party by an independent third party known as an “operator” (data processor).

Any person (being natural or juristic persons, private or public bodies) who believes that Renergen has failed to comply with Renergen’s obligations under the POPIA may lodge a complaint with the Information Regulator, who is, among others, empowered to monitor and enforce compliance with the provisions of the PAIA and the POPIA (the “Information Regulator”), and who is required to investigate the complaint. The Information Regulator may commence an investigation on its own initiative. In conducting this investigation, the Information Regulator may summon and enforce the appearance of persons before the Information Regulator, compel the production of documents, access and search any premises, conduct interviews, and carry out any inquiries at the premises that the Information Regulator deems fit. The Information Regulator is also empowered to issue a request for information by way of an information notice.

Upon completion of the investigation, the Information Regulator may refer the complaint to the Enforcement Committee of the POPIA (the “Enforcement Committee”) for consideration, a finding in respect of the complaint, and a recommendation in respect of the proposed action to be taken by the Information Regulator in respect of the complaint. Based on the recommendations of the Enforcement Committee, the Information Regulator may issue the responsible party with an enforcement notice directing the responsible party to take specific measures or to stop processing personal information or take the steps specified in the notice or refrain from taking such steps. The Information Regulator may also impose an administrative fine.

Renergen cannot guarantee that Renergen’s POPIA compliance efforts will be deemed appropriate or sufficient by regulatory authorities or the courts. South African law provides protection to the personal information of both individuals and companies, the latter forming the vast majority of entities with whom Renergen does business. Moreover, Renergen may have difficulty adapting Renergen’s systems and processes to the new legislation. The changes have impacted, and could further adversely impact, Renergen’s business by increasing Renergen’s operational and compliance costs. Renergen’s or its third-party vendors’ failure to comply with applicable data protection laws and regulations (such as in the event of a security breach) could result in claims, disputes, proceedings, government enforcement actions (which could include civil or criminal penalties), loss in customers and suppliers, private litigation and/or adverse publicity, monetary penalties or other liabilities, all of which could increase Renergen’s costs of doing business, distract Renergen’s management, require Renergen to change Renergen’s operations and negatively affect Renergen’s operating results and business. Claims that Renergen has violated data subjects’ privacy rights, failed to comply with data protection laws, or breached Renergen’s contractual obligations or privacy policies, even if Renergen is not found liable, could be expensive and time consuming to defend, could result in adverse publicity and could have a material adverse effect on Renergen’s business, financial condition and results of operations. Renergen may also be contractually required to indemnify and hold harmless third parties from the costs or consequences of non-compliance with any laws, rules and regulations or other legal obligations relating to privacy or consumer protection or any inadvertent or unauthorized use or disclosure of personal information that Renergen stores or otherwise processes as part of operating Renergen’s business.

Unplanned stoppages and unforeseen operational interruptions and operational accidents or injuries could adversely affect Renergen’s performance.

Unplanned stoppages and unforeseen operational interruptions and operational accidents or injuries could adversely affect Renergen’s performance. Renergen’s operational processes may be subject to operational accidents,

22

 


including but not limited to processing plant fires and explosions, damages caused by abnormal wear, inclement weather, incorrect operation, rock bursts, cave-ins or falls of ground, collapse of pit walls, flooding, loss of power supply, environmental pollution and mechanical critical equipment failures. During the period March 1, 2025 to May 31, 2026, Renergen recorded no incidents requiring stoppage of operations, no pollution incidents, and no non-conformance to critical controls events. Renergen recorded 32 “incidents” ranging in severity from observations to minor injuries resulting in first aid treatment with 3 contractors requiring medical treatment and one contractor employee suffering a lost-time injury where the employee lost five shifts. From March 1, 2026 to May 31, 2026, Renergen recorded 56 incidents, none of which required a stoppage of operations and all incidents were not severe only requiring first aid treatment. Additionally, non-compliance with critical controls could lead to safety incidents or potential fatalities. The occurrence of one or more of these events may result in the death of, or personal injury to, personnel, the loss of equipment, damage to or destruction of properties or facilities, disruptions in production, increased costs, environmental damage and potential legal liabilities, all of which could have an adverse effect on Renergen’s business financial condition and results of operations.

Operational risks may adversely impact Renergen’s business or results of operations.

Renergen’s operating results are dependent on the continued operation of Renergen’s exploration and production facilities, Renergen’s ability to meet customer contract requirements and other needs. Insufficient or excess capacity with respect to Renergen’s exploration and production facilities threatens Renergen’s ability to generate competitive profit margins and may expose Renergen to liabilities related to contract commitments. Renergen’s operating results are also dependent on Renergen’s ability to obtain statutorily required consents on time, complete new construction projects on time, on budget and in accordance with performance requirements. Failure to do so may expose Renergen’s business to loss of revenue, potential litigation and loss of business reputation.

Also inherent in the management of Renergen’s production facilities and delivery systems, including storage, vehicle transportation and pipelines, are operational risks that require continuous training, oversight and control. Material operating failures at production or storage facilities or pipelines, including fire, toxic release and explosions, or the occurrence of vehicle transportation accidents could result in loss of life, damage to the environment, loss of production and/or extensive property damage, all of which may negatively impact Renergen’s financial results.

The third parties on whom Renergen may rely for gathering and transportation services are subject to complex laws that may adversely impact Renergen’s business or results of operations.

Generally, Renergen is responsible for conveying gas from the Virginia Gas Plant with a direct connection to trucks owned by Renergen and for transporting the gas directly to end customers. There may be instances where Renergen might rely on a third-party service provider for gathering and transportation services using the transportation fleet of the relevant third-party service provider. Such third-party service providers are subject to complex and stringent laws and regulations that require obtaining and maintaining numerous permits, approvals and certifications from various government authorities. These third parties may incur substantial costs in order to comply with existing laws and regulations. If existing laws and regulations governing such third party services are revised or reinterpreted, if new laws and regulations become applicable to their operations, or if these third parties otherwise change the rates, terms, or conditions of service, such changes may affect the availability of or the costs that Renergen pays for services. Similarly, a failure to comply with such laws and regulations by the third parties could have a material adverse effect on Renergen’s business, financial condition, and results of operations. Moreover, the operations of these third parties could be subject to legal challenges that could disrupt service to Renergen’s operations and consequently adversely impact Renergen’s business or results of operations.

Renergen’s insurance coverage may not adequately satisfy all potential claims in the future.

Although Renergen believes Renergen has sufficient insurance coverage, Renergen may become subject to liability for pollution, occupational illness, climate change and other resource impacts or other hazards against which Renergen has not been insured, cannot insure or is insufficiently insured, including those relating to past operations. Renergen’s existing property and liability insurance contains specific exclusions and limitations on coverage.

23

 


Should Renergen suffer a major loss, which is insufficiently covered, future earnings could be affected. In addition, certain classes of insurance may not continue to be available at economically acceptable premiums. As a result, in the future, Renergen’s insurance coverage may not fully cover the extent of claims against it or any cross-claims made.

Any acquisition, partnership or joint venture that Renergen makes or enters into could disrupt Renergen’s business and harm Renergen’s results of operations and financial condition.

Renergen evaluates, and expects in the future to evaluate, potential strategic acquisitions of, and partnerships or joint ventures with, complementary businesses, services or technologies. Renergen may not, however, be able to identify appropriate acquisition, partnership or joint venture targets in the future, and Renergen’s efforts to identify such targets may result in a loss of time and financial resources. In addition, Renergen may not be able to negotiate or finance such future acquisitions successfully or on favorable terms, enter into partnerships or joint ventures successfully or on favorable terms, or to effectively integrate acquisitions into Renergen’s current business, and Renergen may lose customers or personnel as a result of any such strategic transaction (including the customers and personnel of an acquired business). The process of integrating an acquired business, technology, service, or product into Renergen’s business may divert management’s attention from Renergen’s core business. It may result in unforeseen operating difficulties and expenditures and generate unforeseen pressures and strains on Renergen’s organizational culture. Moreover, Renergen may be unable to realize the expected benefits, synergies or developments that Renergen initially anticipates from such a strategic transaction.

Financing an acquisition or other strategic transaction could result in dilution to existing shareholders from issuing equity securities or convertible debt securities, or a weaker balance sheet from using cash or incurring debt, and equity or debt financing may not be available to Renergen on favorable terms, if at all. In addition, it is possible that the goodwill that has been attributed, or may be attributed, to the strategic target may have to be written down if the valuation assumptions are required to be reassessed as a result of any deterioration in the underlying profitability, asset quality and other relevant matters. There can be no assurance that Renergen will not have to write down the value attributed to goodwill in the future, which would adversely affect Renergen’s results of operations and net assets.

The integration of any acquired assets requires management capacity. There can be no assurance that Renergen’s current management team has sufficient capacity, or that it can acquire additional skills to supplement that capacity, to integrate any acquired or new assets and operations and to realize cost and operational efficiencies at the acquired assets or maintain those at the existing operations.

Furthermore, Renergen may be unable to complete a proposed transaction if Renergen is unable to obtain required regulatory approvals, including approvals from the applicable regulatory authorities in the various jurisdictions in which Renergen or a potential acquisition target operates. Even if Renergen is able to obtain regulatory approval, such approval could be subject to certain conditions, which could prevent Renergen from competing for certain customers or in certain lines of business. In addition, Renergen may face contingent liabilities in connection with Renergen’s acquisitions and joint ventures, including, among others, (1) judicial or administrative proceeding or contingencies relating to Renergen, asset or business acquired, including civil, regulatory, tax, labor, social security, environmental and intellectual property proceedings or contingencies; and (2) financial, reputational and technical issues, including with respect to accounting practices, financial statement disclosures and internal controls, as well as other regulatory or compliance matters, all of which Renergen may not have identified as part of Renergen’s due diligence process and that may not be sufficiently indemnifiable under the relevant acquisition or joint venture agreement. Renergen cannot guarantee that any acquisition, partnership or joint venture Renergen makes will not have a material adverse effect on Renergen’s business, results of operations and financial condition.

Possible disputes in relation to access, use and servitude agreements entered into with landowners could result in timing delays.

To enable Renergen to commence Renergen’s operations and exploration and development activities, Renergen enters into access, use and servitude agreements with the respective landowners. Such agreements allow

24

 


Renergen to access the property to do exploration and construction work and to construct the pipeline, and the landowner permits Renergen to register a pipeline servitude, booster station servitude, or production well servitude. Any disputes between the respective landowner and Renergen could lead to delays in Renergen’s ability to complete exploration and construction work, resulting in time delays and additional costs.

A duly executed agreement to grant a servitude (or so-called unregistered servitude) gives rise to a real right only when it has been registered. Prior to registration, a third party, in particular a purchaser of the underlying land without notice of the servitude, is therefore not bound to recognize it, although the agreement becomes binding immediately inter partes (between the landowner and Renergen). Once registered, or if any third parties have actual knowledge of it, the servitude becomes enforceable against third parties. Registration of the servitudes can be delayed from a timing perspective should the underlying land be encumbered by a mortgage bond and there is a delay in obtaining bondholder consent to register the servitude.

Renergen may not be able to compete with less carbon-intensive sources of energy, such as renewable natural gas and renewable power, given the expected global energy transition to a low carbon economy.

While Renergen believes it offers a competitive, less carbon-intensive source of helium and natural gas for use in transportation, industrial processes and power generation, Renergen cannot guarantee that Renergen’s products will remain competitive with other sources of energy or that even lower carbon intensive alternatives to Renergen’s products may emerge in the market. Many stakeholders are focused on the development of zero-carbon or carbon negative resources, such as renewable power from wind, solar, or other sources, or renewable natural gas, to assist in the global transition to a low carbon economy, and Renergen cannot guarantee that changes in consumer demand for Renergen’s products will not adversely affect Renergen’s business and results of operations.

Risks Related to Renergen’s Indebtedness and Liquidity

Since its inception, Renergen has generated negative operating cash flows, and Renergen may experience negative cash flow from operations in the future. Renergen’s financial statements have been prepared on a going concern basis.

Renergen has not established an ongoing source of revenue sufficient to cover its operating costs and to allow it to continue as a going concern and will require additional financing to fund its future planned operations. Renergen’s consolidated financial statements have been prepared on a going concern basis, which contemplates the realization of assets and the discharge of liabilities in the normal course of business. Renergen’s independent registered public accounting firm has included in its report for the period ended February 28, 2026, an explanatory paragraph expressing substantial doubt about Renergen’s ability to continue as a going concern. The financial statements contained herein for the six months ended June 30, 2026 have been prepared assuming Renergen will continue as a going concern, but the ability of Renergen to continue as a going concern is dependent on Renergen obtaining adequate capital to fund operating losses until it establishes a revenue stream and becomes profitable. Renergen’s ability to continue as a going concern is contingent upon other factors, Renergen’s ability to achieve its revenue forecasts and Renergen’s ability to raise additional capital through sales of securities and incurrence of debt, which may not be available on favorable terms or at all, as needed to fund future growth. Renergen’s future operations are dependent upon the identification and successful completion of equity or debt financing and the continued achievement of profitable operations at an indeterminate time in the future. Renergen may not be successful in completing equity or debt financing or in achieving profitability. If Renergen is not able to obtain the necessary additional financing on a timely basis, Renergen will be required to delay, reduce the scope of, or eliminate one or more of its development activities or commercialization efforts or perhaps even cease the operation of its business.

The DFC Credit Facility Agreement and IDC Loan Agreement place operating restrictions on Renergen and create default risks.

The DFC Credit Facility Agreement and the IDC Loan Agreement contain covenants that place restrictions on Renergen’s operating activities. Pursuant to the DFC Credit Facility Agreement, Tetra4 is required to maintain certain financial covenants, including, (a) (i) a ratio of all interest bearing debt to EBITDA of not more than 3.0 to 1; (ii) a ratio of current assets to current liabilities of not less than 1 to 1; and (iii) a reserve tail ratio of not less than 25%; and (b) (i) a ratio of cash flow to debt service for the most recently completed four consecutive full fiscal

25

 


quarters, taken as a single accounting period, to debt service for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, of not less than 1.30 to 1; and (ii) a ratio of cash flow for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, to debt service for the next succeeding four consecutive full fiscal quarters of not less than 1.3 to 1. Additionally, at all times, Tetra4 is required to ensure that its debt service reserve account is funded in an amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 in respect of its indebtedness with respect to the IDC Loan Agreement for the immediately succeeding six-month period. The covenants in (a) and (b) will apply immediately following the date falling 18 months after the completion of the construction of the Virginia Gas Plant. Furthermore, the DFC Credit Facility Agreement contains negative covenants, which include restrictions on Tetra4's ability to make certain restricted payments, including any dividend or distribution on account of any interest in Tetra4, any payment of principal or interest on any indebtedness of Tetra4 to or for the benefit of any shareholder or other affiliate of Tetra4, and any purchase, redemption, acquisition or retirement of any limited liability company interests of Tetra4 or any indebtedness of Tetra4 held by any shareholder or any affiliate of Tetra4, or any payment to or on behalf of any shareholder or affiliate of any shareholder, subject to certain conditions. In November 2025, the DFC issued a notice of default in connection with a missed payment under the DFC Credit Facility Agreement, which default has since been cured with the DFC’s written consent.

Pursuant to the IDC Loan Agreement, Tetra4 is required to maintain certain financial covenants, including (a) a ratio of all interest bearing debt to EBITDA of not more than 3.0 to 1; (b) a ratio of current assets to current liabilities of not less than 1 to 1; (c) a ratio of cash flow for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, to debt service for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, of not less than 1.30 to 1; (d) a ratio of cash flow for the most recently completed four fiscal quarters, taken as a single accounting period, to debt service for the next succeeding four consecutive full fiscal quarters of not less than 1.3 to 1; and (e) at all times, a reserve tail ratio of not less than 25%. Additionally, at all times, Tetra4 is required to ensure that its debt service reserve account is funded in an amount equal to, on any given date, a Rand amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 under the IDC Loan Agreement for the immediately succeeding six-month period, to be used as a payment buffer for Tetra4’s repayment obligations under and in terms of the IDC Loan Agreement. In addition, the IDC Loan Agreement contains negative covenants, which include that Tetra4 shall not make any shareholder dividend distribution, repay any shareholders’ loans and/or pay any interest on shareholders’ loans or make any payments whatsoever to its shareholders without the IDC’s prior written consent if (i) Tetra4 is in breach of any term of the IDC Loan Agreement or (ii) the making of such payment would result in a breach of any one or more of the financial ratios described above.

The financial covenants described in (a) to (e) in the above paragraph became effective on February 15, 2026. As of February 28, 2026 and May 31, 2026, Tetra4 was not in compliance with the covenants described in clauses (a)-(d) in the above paragraph, and has requested an extension of the effective date to May 1, 2028, which is subject to approval by the IDC. Tetra4 is actively engaged in discussions with IDC to amend the IDC Loan Agreement to align the calculation date with the completion of Phase 1 of the Virginia Gas Project. While Renergen expects to receive a waiver from IDC in connection with the renegotiation of the applicable calculation date, it is not guaranteed that IDC will consent, and if any future default occurs, that IDC would be willing to consent to any future amendments to the financial covenants. In connection with these matters, approximately $111.3 million of Renergen’s long-term borrowings have been reclassified as current liabilities as of February 28, 2026. Renergen’s ability to comply with these covenants may be affected by events and factors beyond its control. These restrictions may interfere with Renergen’s ability to obtain financing or to engage in other business activities, which may have a material adverse effect on Renergen’s business, financial condition or results of operations. There can be no assurance that Renergen will be able to obtain waivers or amendments on acceptable terms, or at all, or that its lenders will not exercise remedies available to them, including acceleration of outstanding indebtedness, which could have a material adverse effect on Renergen’s business, financial condition and results of operations.

If Renergen is unable to comply with the covenants contained in the DFC Credit Facility Agreement and the IDC Loan Agreement, it could constitute an event of default and Renergen’s lenders could declare all borrowings outstanding, together with all other amounts owing under the related financing documents and accrued and unpaid interest, to be immediately due and payable. If Renergen is unable to repay or otherwise refinance these borrowings when due, Renergen’s lenders could sell the collateral securing the DFC Credit Facility Agreement and the IDC

26

 


Loan Agreement, which constitute substantially all of Renergen’s assets. The occurrence of any of these events could have a material adverse effect on Renergen’s business, financial condition, results of operations, and prospects.

Renergen will continue to have the ability to incur debt and Renergen’s levels of debt may affect Renergen’s operations and Renergen’s ability to pay the principal of and interest on Renergen’s debt.

In the future, Renergen and its subsidiaries may be able to incur substantial additional debt from amendments to the DFC Credit Facility Agreement or the IDC Loan Agreement, from additional lending sources subject to the restrictions contained in those agreements, or through certain additional debt instruments Renergen may issue. As of May 31, 2026, Renergen had $115.1 million of outstanding borrowings.

Renergen’s indebtedness could be costly or have adverse consequences, such as:

•
requiring Renergen to dedicate a substantial portion of Renergen’s cash flows from operations to payments on Renergen’s debt;
•
limiting Renergen’s ability to obtain future financing for working capital, capital expenditures, acquisitions, debt obligations and other general corporate requirements;
•
making Renergen more vulnerable to adverse conditions in the general economy or Renergen’s industry and to fluctuations in Renergen’s operating results, including affecting Renergen’s ability to comply with and maintain any financial tests and ratios required under Renergen’s indebtedness;
•
limiting Renergen’s flexibility to engage in certain transactions or to plan for, or react to, changes in Renergen’s business and industry;
•
putting Renergen at a disadvantage compared to competitors that have less relative and/or less restrictive debt; and
•
subjecting Renergen to additional restrictive financial and other covenants.

If Renergen incurs substantial additional indebtedness in the future, these higher levels of indebtedness may affect Renergen’s ability to pay the principal of and interest on existing indebtedness and Renergen’s creditworthiness generally.

Renergen may not be able to generate sufficient cash to service all of Renergen’s indebtedness and may be forced to take other actions to satisfy Renergen’s obligations under applicable debt instruments, which may not be successful.

Renergen’s ability to make scheduled payments on or to refinance Renergen’s indebtedness obligations, including under the DFC Credit Facility Agreement and the IDC Loan Agreement, depends on Renergen’s financial condition and operating performance, which are subject to prevailing economic and competitive conditions and certain financial, business and other factors beyond Renergen’s control. Renergen may not be able to maintain a level of cash flow from operating activities sufficient to permit Renergen to pay the principal, premium, if any, and interest on Renergen’s indebtedness. For example, in November 2025, Tetra4 did not make a scheduled payment under the DFC Credit Facility when due. While the DFC subsequently waived the resulting payment default and consented to the use of funds held in its debt service reserve account to settle the missed payment, there is no guarantee that Renergen will not default on the DFC Credit Facility Agreement in the future, and that upon any such default, the DFC would consent to a settlement.

Additionally, Renergen anticipates incurring a substantial amount of indebtedness to fund the anticipated build cost to construct Phase 2, which will increase the risk that Renergen is unable to generate sufficient cash to service all of Renergen’s indebtedness. Although Renergen intends to fund some of the build cost to construct Phase 2 with equity offerings and operating cash flows, the indebtedness necessary to fund the remaining portion of the build cost will substantially increase Renergen’s outstanding indebtedness and the requisite cash flows to service such indebtedness.

If Renergen’s cash flow and capital resources are insufficient to fund debt service obligations, Renergen may be forced to reduce or delay investments and capital expenditures, sell assets, seek additional capital or restructure or

27

 


refinance indebtedness. Renergen’s ability to restructure or refinance indebtedness will depend on the condition of the capital markets and Renergen’s financial condition at such time. Any refinancing of indebtedness may be at higher interest rates and may require Renergen to comply with more onerous covenants, which could further restrict business operations. The terms of Renergen’s existing or future debt instruments may restrict Renergen from adopting some of these alternatives. In addition, any failure to make payments of interest and principal on outstanding indebtedness on a timely basis would likely result in a reduction of Renergen’s credit rating, which could harm Renergen’s ability to incur additional indebtedness. In the absence of sufficient cash flows and capital resources, Renergen could face substantial liquidity problems and might be required to dispose of material assets or operations to meet debt service and other obligations. Any future indebtedness may restrict Renergen’s ability to dispose of assets and impose limitations on Renergen’s use of proceeds from dispositions. Furthermore, Renergen may not be able to consummate those dispositions, and the proceeds of any such disposition may not be adequate to meet any debt service obligations then due. These alternative measures may not be successful and may not permit Renergen to meet scheduled debt service obligations.

Renergen’s outstanding indebtedness under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan bear interest at a variable rate, which makes Renergen more vulnerable to increases in interest rates and could cause Renergen’s interest expense to increase and decrease cash available for operations and other purposes.

Borrowings under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan bear interest at a variable rate, which increases and decreases based upon changes in the underlying interest rate. Any such increases in the interest rate or increases of Renergen’s borrowings under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan will increase Renergen’s interest expense and reduce Renergen’s funds available for operations and other purposes. Although from time to time Renergen may enter into agreements to hedge a portion of Renergen’s interest rate exposure, these agreements may be costly and may not protect against all interest rate fluctuations. Accordingly, Renergen may experience material increases in Renergen’s interest expense as a result of increases in interest rate levels generally.

Renergen is party to an intercompany term loan facility with ASP Isotopes, and its intercompany indebtedness may increase substantially in connection with the Merger.

Renergen is party to the ASP Isotopes Term Loan Facility (as defined herein), as amended, pursuant to which ASP Isotopes may provide loans to Renergen of up to $120 million. Prior to or at the Closing, the parties to the ASP Isotopes Term Loan Facility, are expected to enter into that certain Sixth Addendum to the ASP Isotopes Term Loan Facility to further increase the aggregate principal amount to $200 million. The ASP Isotopes Term Loan Facility is unsecured and is repayable within 60 days following written demand by ASP Isotopes, which may be made at ASP Isotopes’ sole discretion in accordance with the terms of the ASP Isotopes Term Loan Facility. Any borrowings under the ASP Isotopes Term Loan Facility would increase Renergen’s overall indebtedness and debt service obligations and would result in a significant obligation owed to ASP Isotopes, which following the Merger will be the Combined Company’s controlling stockholder. Renergen may not generate sufficient cash to service this additional indebtedness, and the terms of the facility and Renergen’s other debt agreements may limit its financial and operating flexibility. In addition, ASP Isotopes may demand repayment of the ASP Isotopes Term Loan Facility at any time with 60 days notice, and Renergen may not have sufficient cash to repay ASP Isotopes upon demand. Any of the foregoing could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Risks Related to Renergen’s Legal, Regulatory and Compliance Matters

Renergen’s exploration rights and production right in South Africa could be altered, suspended, or canceled for a variety of reasons, including uncertainties associated with national and local legislation.

Various national and local policies, laws and regulations, norms and standards govern Renergen’s exploration rights and production right, which are characterized by significant uncertainties associated with both their formulation as well as implementation. Under the applicable South African laws and regulations, Renergen is required to obtain certain permits, licenses and approvals for Renergen’s exploration and production activities, including, among others, exploration rights, production rights, environmental authorizations and integrated water

28

 


use licenses. Moreover, Renergen is required to comply with the terms and conditions attached to such permits, licenses and approvals, including by filing certain reports and plans with the relevant authorities from time to time. These permits, licenses and approvals are issued by ministries and/or agencies of the South African government and are crucial to Renergen’s business operations. Although Renergen has obtained or is otherwise applying for all consents necessary to conduct Renergen’s business, there can be no assurance that Renergen will obtain, retain, timely renew or comply with all of the terms and conditions attaching to such consents.

Any failure to obtain, renew or retain or any delay (and/or failure by relevant government authorities) in obtaining, retaining or renewing any required permits, licenses or approvals, may result in a delay in Renergen’s investment or development of a resource which may have a material adverse effect on Renergen’s business, results of operations, financial position and/or growth prospects. Additionally, Renergen’s existing licenses, permits and other authorizations may be suspended, terminated or revoked if Renergen fails to comply with the relevant requirements. Should Renergen fail to fulfil the specific terms of permits, licenses and other authorizations or if Renergen operates Renergen’s business in a manner that violates applicable law, regulators may impose fines or suspend or terminate such licenses, permits or other authorizations. The failure to comply with the terms and conditions attached to such consents timely and strictly in line with the applicable requirements could negatively affect Renergen’s operations, and subject Renergen to a variety of administrative or criminal penalties, other government actions or reputational harm, which may have a material adverse effect on Renergen’s business, results of operations, financial position and/or growth prospects.

Renergen’s production right expires on September 20, 2042.

Renergen’s Virginia-area exploration rights were set to expire on August 23, 2024; however, Renergen submitted an application on July 16, 2024 to incorporate those exploration rights into its production right by means of an amendment to the production right in accordance with Section 102 of the MPRDA, which Renergen expects would extend its ability to carry out petroleum exploration activities through the expiration date of its production right. The application was authorized on May 9, 2025, and following that authorization two appeals were lodged by various parties. The appeal process is ongoing, and Renergen expects it to be resolved in 2027. If Renergen’s exploration rights or production right expire or are not renewed or extended, or if the pending appeals are resolved adversely, Renergen could lose its right to explore, produce and develop the related properties, which could have a material adverse effect on its business, results of operations and financial condition.

Renergen is subject to legislation, regulations and policies and compliance with current and future administrative, regulatory and other obligations could result in increased costs.

Renergen’s exploration, technical cooperations, production and operational development activities are subject to South African laws and regulations governing various matters. The Mineral and Petroleum Resources Development Act 28 of 2002 (the “MPRDA”) remains the primary governing legislation, but the Upstream Petroleum Resources Development Act 23 of 2024 (the “UPRDA”) has been assented to and published but has not yet commenced. Upon commencement, the UPRDA is intended to replace the MPRDA with respect to upstream petroleum activities, which may introduce new regulatory requirements, compliance costs or uncertainties that could affect Renergen’s existing rights and operations. Among other things, the UPRDA provides for (i) a right of the State, through the State Petroleum Company, to a 20% carried interest in petroleum rights in both the exploration and production phases, the costs of which are borne by the holder, subject to limited rights of cost recovery; (ii) a requirement that every petroleum right have a minimum 10% participating interest held by black persons, as defined in the UPRDA; and (iii) an obligation on petroleum right holders to sell a percentage of their petroleum, as determined by the State Petroleum Company or another designated state-owned entity, to meet the State's strategic stock requirements.

The UPRDA also requires production rights granted under the MPRDA, including the Production Right held by Tetra4, to be converted into petroleum rights within a prescribed period after commencement. The extent to which these and other provisions of the UPRDA, and the regulations to be made under it, will apply to the Production Right, and when, is uncertain. If they apply, they could, among other things, materially dilute Renergen's economic interest in the Virginia Gas Project, increase Renergen's funding obligations and reduce the revenues and cash flows available to Renergen. The South African laws and regulations to which Renergen is subject also include

29

 


laws and regulations relating to environmental protection, the management of natural resources, the management and use of hazardous substances and explosives, exploration, production and post-closure reclamation and rehabilitation, exports, the regulation of the trading of gas, price controls, repatriation of capital and exchange controls, taxation, labor standards and other employment-related laws and occupational health and safety and historic and cultural preservation.

The costs associated with compliance with these laws and regulations are substantial, and possible future laws and regulations as well as changes to existing laws and regulations could cause additional expense, capital expenditures, restrictions on or suspensions of Renergen’s operations and delays in the development of Renergen’s assets.

Moreover, environmental and regulatory laws and regulations change frequently (due to general amendments or amendments brought about as a result of case law) and are generally becoming more stringent across the global natural gas industry. If Renergen’s environmental compliance obligations were to change as a result of changes to laws or regulations or as a result of changes in certain assumptions Renergen makes to estimate liabilities, or if unanticipated conditions were to arise in connection with Renergen’s operations, Renergen’s expenses and provisions would increase to reflect these changes. If material, these expenses and provisions could adversely affect Renergen’s business, operating results and financial condition.

Renergen is subject to risks associated with litigation and regulatory proceedings, which could have a material adverse effect on Renergen’s business, operating results and financial condition.

Furthermore, Renergen is currently, and has been in the past, involved in legal proceedings related to its debt arrangements and agreements. For example, the Airsol Subscription Agreement was not repaid due to a dispute between the parties in respect of repayment. On August 4, 2026, the legal dispute with Airsol was resolved and Renergen has agreed to pay the sum of the principal, accrued interest and certain fees for a total of $8.5 million in three equal installments beginning five business days after certain customary regulatory approvals are obtained and ending in November 2026. In addition, on November 14, 2024, Molopo (as defined below) initiated legal proceedings against Tetra4 in the High Court of South Africa, Gauteng Local Division, Johannesburg, by issuing summons alleging a breach of the Molopo Loan when Renergen sold a 5.5% stake in Tetra4 to a noncontrolling interest. As a consequence, Molopo has purported to cancel the Molopo Loan, which cancellation is disputed by Tetra4 on the basis that the investment by the minority interest did not trigger a payment by Tetra4 to its parent in the sale. According to the Lead Times Bulletin for the High Court in Gauteng, the soonest hearing date is estimated to take place in December 2030, and the Molopo Loan continues to be classified as non-current, and interest continues to be accounted for at the prime lending rate plus 2% pursuant to the Molopo Loan.

From time to time, Renergen is or may also become party to litigation, arbitration, contested case hearings, regulatory proceedings, administrative appeals and other legal or judicial proceedings arising in the ordinary course of our business or otherwise, including proceedings relating to the issuance, renewal, amendment, or validity of the rights, permits, licenses and authorizations required for our projects and operations. For example, on January 26, 2024, the Director General of the Department of Mineral Resources and Energy granted Tetra4 consent under section 102 of the MPRDA to amend its production right to include helium as a by‑product of petroleum/natural gas. Vicsamoki (as defined below) lodged an internal appeal in terms of section 96 of the MPRDA read with regulation 74, which the Minister dismissed on August 14, 2025, thereby confirming the section 102 decision. Subsequently, on February 11, 2026, Vicsamoki instituted High Court proceedings against the Minister and Tetra4 seeking to have the section 102 decision declared void, alternatively reviewed and set aside. The matter is set for hearing on October 26, 2026. In addition, Renergen has disputed NERSA’s jurisdiction claim that Renergen requires a license from NERSA to trade in gas in South Africa, as well as to construct and operate liquefaction plants. The High Court ruled that the Gas Act No. 48 of 2001, does not apply to any of the production activities and incidental activities authorized under a production right granted in terms of the Mineral and Petroleum Resources Development Act. NERSA filed its notice of intention to appeal the decision of the High Court on May 23, 2025. The hearing of the application was confirmed for August 4, 2025. On August 12, 2025, the High Court dismissed NERSA’s application for leave to appeal. On September 11, 2025, NERSA filed a petition for leave to appeal to the Supreme Court of Appeal (the “SCA”). On November 26, 2025, the SCA granted NERSA leave to appeal, and on January 26, 2026, NERSA filed its notice of appeal with the SCA. Accordingly, the matter is pending before the SCA, and proceedings will advance through the appellate process in due course.

30

 


Litigation, arbitration, regulatory proceedings and other types of disputes are costly and involve inherent uncertainties and, as a result, Renergen faces risks associated with adverse judgments or outcomes in these matters. Even in cases where Renergen may ultimately prevail on the merits of any such dispute, Renergen may face significant costs defending its rights, the proceedings may divert the attention of management and other personnel from Renergen’s operations, limit Renergen’s ability to obtain financing and lose certain rights or benefits during the pendency of any such litigation, arbitration, regulatory proceeding or other dispute, or suffer reputational damage as a result of Renergen’s involvement therein. There can be no assurance as to the outcome of any litigation, arbitration, regulatory proceeding or other dispute, and the adverse determination of material litigation could have a material adverse effect on Renergen’s business, operating results and financial condition.

An adverse ruling in the pending NERSA appeal to the Supreme Court of Appeal could subject Renergen to additional licensing requirements and regulatory oversight.

Renergen’s subsidiary, Tetra4, has disputed NERSA’s jurisdiction over its gas trading and liquefaction activities. In May 2025, the High Court ruled in Tetra4’s favor, holding that the Gas Act does not apply to production activities authorized under a production right granted in terms of the MPRDA. However, NERSA has been granted leave to appeal to the Supreme Court of Appeal, and the matter is currently pending. If the SCA reverses the High Court’s decision, Renergen could be required to obtain a NERSA license for its gas trading, liquefaction and related activities, which could subject Renergen to additional regulatory requirements, tariff regulation and compliance costs, and could delay or disrupt Renergen’s operations. In addition, in March 2026, the Minister of Electricity and Energy introduced the Gas Bill (B6-2026) in the National Assembly, which seeks to repeal the Gas Act and replace it with an updated regulatory framework. The implications of this proposed legislation for Renergen’s operations are uncertain.

Renergen’s failure to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar laws and regulations could negatively impact Renergen’s reputation and results of operations.

The legal and regulatory framework in which Renergen operates is complex, and Renergen’s governance and compliance policies and processes may not prevent potential breaches of law or accounting or other governance practices. Renergen’s operating and ethical policies, among other standards and guidance, may not prevent instances of fraudulent behavior and dishonesty, nor guarantee compliance with legal and regulatory requirements.

Renergen is required to comply with anti-corruption laws and regulations imposed by governments around the world with jurisdiction over Renergen’s operations, which may include South African anti-bribery and corruption legislation, as well as the laws of the other countries (for example, the U.S. Foreign Corrupt Practices Act of 1977) where Renergen does business or has a close connection. These laws and regulations may restrict Renergen’s operations, trade practices, investment decisions and partnering activities. These and other applicable laws prohibit Renergen and Renergen’s officers, directors, employees and business partners acting on Renergen’s behalf, including agents, from corruptly offering, promising, authorizing or providing anything of value to government officials for the purposes of influencing official decisions or obtaining or retaining business or otherwise obtaining favorable treatment. They also require that Renergen maintain accurate books and records and have a system of internal controls sufficient to, among other things, provide reasonable assurances that transactions are executed and assets are accessed and accounted for in accordance with management's authorization. Renergen must comply with the South African anti-corruption law, the Prevention and Combating of Corrupt Activities Act, No. 12 of 2004, as amended (“PRECCA”), which prohibits public and private bribery and criminalizes various categories of corrupt activities. PRECCA also contains a reporting obligation to authorities of known or suspected corrupt activities which is triggered when the value of any known or suspected acts of corruption exceeds R100,000. Failure to report said corrupt activities is a criminal offense under PRECCA and imposes significant penalties on those convicted of corrupt activities. Regulation 43 of the Companies Act also contains a number of anti-corruption compliance obligations that Renergen must adhere to. Some applicable anti-corruption laws may also prohibit so-called commercial or private bribery of private individuals. Renergen is subject to the jurisdiction of various governments and regulatory agencies around the world, which may bring Renergen’s personnel and representatives into contact with government officials responsible for, among other things, issuing or renewing permits, licenses or approvals or for enforcing other governmental regulations.

31

 


Renergen’s failure to successfully comply with these laws and regulations may expose Renergen to reputational harm, as well as significant sanctions, including criminal fines, imprisonment, civil penalties, disgorgement of profits, injunctions and debarment from government contracts, as well as other remedial measures.

Investigations of alleged violations can be expensive and disruptive. Renergen continuously develops and maintains policies and procedures designed to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar laws. However, there can be no guarantee that Renergen’s policies and procedures will effectively prevent violations by Renergen’s employees or business partners acting on Renergen’s behalf, for which Renergen may be held responsible, and any such violation could adversely affect Renergen’s reputation, business, results of operations, and financial condition.

Once an amendment to the South African loss carry forward rules comes into operation, it could have an adverse effect on Renergen’s financial results.

Renergen’s principal operating subsidiaries are South African tax residents. The loss carry forward rules are regulated by section 20 of the South African Income Tax Act No. 58 of 1962 (as amended from time to time) (the “South African Income Tax Act”). In determining taxable income as per enacted legislation, corporate taxpayers must set off their full extent of the balance of assessed loss carried forward from the preceding tax year against their income, with any unutilized assessed loss balance carried forward to future years of assessment to be set off against future income.

In an attempt to broaden the corporate income tax base, the South African Taxation Laws Amendment Act No. 20 of 2021 was promulgated on January 19, 2022, resulting in the amendment of section 20 of the South African Income Tax Act regulating use of assessed losses by companies. Pursuant to this amendment, companies are permitted to set-off the balance of an assessed loss carried from the prior year of assessment (i.e., the historic position), but only to the extent that the set-off does not exceed the higher of R1 million and 80% of the amount of taxable income determined for that year (before taking into account such balance of assessed loss). The unutilized balance of assessed loss will be carried forward to the following year of assessment. The amended loss utilization provisions will apply to years of assessment which end on or after March 31, 2023.

Due to the amendment to section 20 of the South African Income Tax Act, Renergen may experience delays in the utilization of the balance of Renergen’s assessed losses carried forward, which could have an adverse effect on Renergen’s financial results.

Amendments to tax legislation, tax rates or the administration or interpretation thereof may impact Renergen’s business, results of operations, financial condition and/or prospects.

Renergen is subject to various direct and indirect taxes. Tax legislation or the administration or interpretation thereof is subject to change occasioned by amendments, court decisions and the respective revenue authorities’ pronouncements on accepted practice in South Africa. These changes could affect Renergen’s overall effective tax rate, thereby impacting Renergen’s earnings, or could impact demand for Renergen’s products, which could, in turn, have a material adverse effect on Renergen’s business, financial results and/or prospects.

Renergen cannot predict the impact of future changes in tax legislation, or interpretation thereof. Amendments to existing tax legislation, or the introduction of new rules in South Africa, may have an impact on the investment decisions of either existing or potential shareholders.

Renergen may be exposed to historical environmental liability risk in respect of Renergen’s closed, closing or sold assets.

Section 28 of the South African National Environmental Management Act 107 of 1998 (“NEMA”) and section 19 of the National Water Act No. 36 of 1998 (the “NWA”) both impose a statutory duty of care for significant environmental pollution or degradation and require remedial measures to be taken in order to address any such environmental degradation, regardless of when it occurred. This duty applies retrospectively and may expose Renergen to historical environmental liability risks in respect of Renergen’s closed, closing or sold assets. Under

32

 


NEMA, the liability of the gas facility continues post-closure indefinitely, notwithstanding the issuance of a closure certificate by the relevant minister, especially where the treatment of water is incorporated. Notwithstanding the onerous statutory duty imposed by NEMA and NWA, Renergen may, in the future, be subject to further incremental legislation that imposes increased environmental liability and may result in significant costs being incurred well above the costs anticipated by Renergen. Any assessment on or adverse finding against Renergen of historical environmental liability may result in significant costs being incurred by Renergen, which may, in turn, have a material adverse effect on Renergen’s business, results of operations, and financial condition.

Risks Related to Operating in South Africa

Renergen may not be able to effectively and efficiently manage the disruption to Renergen’s operations as a result of the ongoing electricity generation crisis in South Africa, which could adversely affect Renergen’s results of operations, financial position, cash flows and future growth.

In 2022 and 2023, South Africa experienced multiple electricity supply crises due to the inability of Eskom, the sole, state-owned energy supplier, to reliably provide electrical power throughout the country. Both the government of South Africa and the U.S. Embassy & Consulates in South Africa declared a “State of Disaster” in response to ongoing power shortages. Previously, South Africa has endured several reductions in the power supply, such as South Africa’s order to Eskom in 2021 to reduce by one-third its operating capacity to limit its greenhouse gas emissions (which has been subsequently been significantly amended, with a delay in decommissioning of multiple units). The year 2022 saw more than twice as many blackouts as any other year, as aging coal-fired power plants broke down and Eskom struggled to buy diesel for emergency generators. Load-shedding resulted in 2023 in localized power outages of up to six hours or more per day throughout the country. Consequentially, Renergen has experienced, and could continue to experience, increased electricity prices as result of the energy supply crisis. While the supply situation has improved since 2024 with Eskom’s Energy Availability Factor approaching excess capacity, there is no guarantee that load-shedding will not be required in the future due to supply pressures. Renergen’s results of operations, financial position, cash flows and future growth could be adversely affected by the ongoing electricity supply crisis in South Africa, including due to capacity reductions, load shedding and/or electricity price increases.

Economic, political or social instability in South Africa may have a material adverse effect on Renergen’s operations and profits.

Renergen’s petroleum operations are located in South Africa. High levels of unemployment and a shortage of critical skills in South Africa, despite increased government expenditure on education and training, remain issues that impact the local economy. Changes to, or increased instability in the economic, political or social environment in South Africa or surrounding countries could create uncertainty, which discourages investment in the region and may affect investments in Renergen. In addition, socio-political instability and unrest may also disrupt Renergen’s business and operations, compromise safety and security, increase costs, affect employee morale, impact Renergen’s ability to deliver Renergen’s operational plans, create uncertainty regarding Renergen’s exploration and production licenses, and cause reputational damage. Such instability could also lead to disruptions to transportation routes or supply chains, increased security costs, difficulty moving personnel or supplies into or out of affected areas, sanctions or other governmental restrictions, or reductions in available capital for development projects, any of which could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Community disruptions could result in access to Renergen’s petroleum operations being obstructed, Renergen’s property being damaged and production being interrupted. Any threats, or actual proceedings, to nationalize any of Renergen’s assets could cause a cessation or curtailment of Renergen’s operations, resulting in a material adverse effect on Renergen’s business, operating results and financial condition. If any of these risks materialize, this could cause a rapid decline in the value of Renergen’s securities, thereby possibly causing investors to lose their respective investments.

High levels of unemployment and a shortage of critical skills in South Africa, despite increased government expenditure on education and training, remain issues that impact the local economy. South Africa’s unemployment rate was 31.9% in the third quarter of 2024. Several political and economic factors have led to, and may continue to

33

 


lead, to further downgrades in national credit ratings, and may adversely affect the South African petroleum industry as a whole, as well as Renergen’s operations.

More specifically, South African petroleum companies are experiencing increasing trends of incitement, breaches of perimeter security, vandalism and robbery, as well as the intimidation and murder of employees.

In addition, economic and political instability and geopolitical events in regions outside of South Africa could result in unavoidable uncertainties and events. These include the ongoing war between Russia and Ukraine, which began in February 2022, and the retaliatory measures that have been taken, or could be taken in the future, by the United States and other countries. They also include the armed conflict between the United States, Israel and Iran that began in February 2026, including the related disruption to shipping through the Strait of Hormuz. These uncertainties and events have negatively affected, and could continue to negatively affect, the risk appetite for investments in the equity markets, South Africa and energy companies in particular. They have also caused, and could continue to cause, volatility in currency exchange rates, commodity prices, interest rates, and worldwide political, regulatory, economic or market conditions, and could contribute to instability in political institutions, regulatory agencies, and financial markets.

More recently, relations between the United States and South African governments have become strained, and the U.S. has taken, and may in the future take, actions adverse to South Africa. These include tariffs on South African imports, most recently a 12.5% tariff on many South African goods imposed in July 2026 under Section 301 of the Trade Act of 1974, which to best of Renergen’s knowledge does not currently apply to helium. They also include the reconsideration of trade preferences historically extended to South Africa under the African Growth and Opportunity Act (“AGOA”). Any of these factors could have a material adverse effect on Renergen's business, operating results and financial condition.

In particular, AGOA provides eligible sub-Saharan African countries, including South Africa, with duty-free access to the U.S. market for many products. AGOA lapsed in September 2025 and was subsequently reauthorized, most recently through December 31, 2028. However, South Africa’s continued eligibility as a beneficiary country remains uncertain. The President reviews eligibility annually, and members of Congress have proposed legislation to remove South Africa from the program, particularly in light of current tensions between the U.S. and South African governments. The removal of South Africa as a beneficiary country, a failure to further reauthorize AGOA after 2028, or the extension of existing or additional tariffs or other trade restrictions to South African goods, including helium, could adversely affect the South African economy, the value of the South African rand and the cost and availability of financing, equipment and materials for Renergen’s operations. Any of these could have a material adverse effect on Renergen’s business, results of operations and financial condition.

South African exchange control regulations could materially constrain Renergen’s financial flexibility.

South Africa’s existing Exchange Control Regulations restrict the ability of South African companies to convert or transfer sums in foreign currencies to or from South Africa. Transactions between South African residents (including companies) and non-residents (excluding residents of the Common Monetary Area (“CMA”)) are subject to exchange controls enforced by the SARB.

As a result, Renergen’s ability to raise or deploy loan funding outside the CMA is currently subject to consent from either the SARB, or where such authority has been delegated, an “Authorized Dealer” with full capacity at an approved bank operating in South Africa, particularly any debt funding that Renergen may require from offshore lenders. These limitations placed on flowing all funds in an unregulated manner could hinder Renergen’s financial and strategic flexibility, particularly Renergen’s ability to raise funds outside South Africa.

In February 2020, the Minister of Finance announced a new capital flow management system in the 2020 Budget Speech, in terms of which all foreign-currency transactions will be allowed, except for a risk-based list of capital flow measures. The 2021 Budget Speech on February 24, 2021 stated the new capital flow management framework would continue to be developed and that new regulations in this regard will be published “shortly.” To date, the new framework and regulations have not yet been published, although there has been an ongoing relaxation of current exchange controls with a view to easing controls and implementing a prudential-based system.

34

 


There is no assurance that restrictions on currency exchange will not be reinstated or implemented in the future or that these restrictions will not limit the ability of Renergen’s subsidiaries to transfer cash or borrow from outside the CMA, which could have a material adverse effect on Renergen’s business, results of operations, financial condition and prospects.

Renergen’s business, results of operations, and financial condition may be adversely affected by inflation in South Africa.

South Africa may continue to experience high levels of inflation in the future, which may increase Renergen’s costs, such as labor and energy, as well as Renergen’s revenues. Inflationary pressures may also curtail Renergen’s ability to access international financial markets and may lead to further government intervention in the economy. This may include the introduction of government policies that may materially and adversely affect the overall performance of the South African economy, which in turn may materially and adversely affect Renergen.

HIV/AIDS, tuberculosis and other contagious diseases pose risks to Renergen in terms of lost productivity and increased costs.

The prevalence of HIV/AIDS in South Africa poses risks to Renergen in terms of potentially reduced productivity and increased medical and other costs. Compounding this are the concomitant infections, such as tuberculosis, that can accompany HIV illness, particularly during the latter stages, and cause additional healthcare-related costs. If there is a significant increase in the prevalence of HIV/AIDS infection and related diseases, or other diseases among the workforce, this may have a material adverse effect on Renergen’s business, results of operations and financial condition.

The costs of healthcare services may increase in the future depending on underlying legislation and the profile of Renergen’s employees.

Healthcare costs in South Africa have increased in recent years. Healthcare, and particularly occupational healthcare, is provided by Discovery, Bonitas and Medihelp. There is a risk that the cost of providing such services could change in the future, depending on, among other things, the nature of underlying legislation and the profile of employees. This cost, should it transpire, is difficult to estimate. Significant increases in the costs of healthcare provided to Renergen’s employees at Renergen’s facilities or mandated contributions to any national healthcare fund could have an adverse effect on Renergen’s business, financial condition and results of operations.

 